My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 1:42:01 PM
Creation date
6/23/2020 6:54:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW NO. 1-2100 SERIES GRADE <br />LEVEL SPILL CONTAINER <br />INSTALLATION INSTRUCTIONS: <br />Step1. <br />Per California SB -989, all metal must be protected <br />from direct contact with the elements. Coat stainless <br />steel band clamps with the following approved <br />coatings. OPW SL -1100, 3M Underseal 08883 or <br />Polyguard Mastic CA -9. Only the threaded hardware <br />needs to be coated in the field. <br />Step 2: (See Figure 1 & 2) <br />Set riser pipe. "L" is the distance between the top of <br />the riser pipe and finish grade. <br />Model Series <br />"L" Dimension <br />1-2100, 5 Gallon <br />L=15" (38cm) <br />1-2100E, 7.5 Gallon <br />L=21" (53cm) <br />(Deep Bellows Model) <br />1-2115, 15 Gallon <br />L=20" (51 cm) <br />Note: If using OPW FSA -400, add 3-1/4" to Dimension <br />,1L ,. <br />Dust Cap <br />Step 3: <br />Deburr and'thoroughly clean riser pipe. Apply pipe <br />dope to riser threads. Pipe dope to be a non - <br />hardening, gasoline resistant pipe thread seal <br />compound. <br />Step 4: <br />Install OPW FSA -400 Face Seal Adapter onto riser <br />using the OPW 61 SA -TOOL. Torque to 125 ft -lbs <br />min. to 250 ft -lbs max.(4" NPT). Apply pipe dope to <br />FSA -400. Pipe dope to be a non -hardening, gasoline <br />resistant pipe thread seal compound. <br />Step 5: <br />Install spill container by rotating the mounting ring until <br />hand tight. <br />NOTE: Do not attempt to completely tighten the <br />container by using the mounting ring <br />Step 6: <br />Finish tightening the spill container with the OPW <br />61 SA -TOOL. Torque to 125 ft -lbs min. to 250 ft. Lbs. <br />max. (4" NPT) <br />Step 7: (See Figure 2) <br />Apply pipe dope to nipple and install. Pipe dope to be <br />a non -hardening, gasoline resistant pipe thread seal <br />compound. Use only factory made nipples. Nipples <br />must be cut square and deburred. Torque to 125 ft - <br />lbs min. to 250 ft -lbs max. (4" NPT). Torque value is <br />based on rotation at the center of pipe. For standard <br />cover models install adaptor and dust cap. For <br />sealable cover (1 SC) models, install a standard 4" <br />pipe cap to support adjustment system. (Adaptor and <br />N <br />dust cap must be installed in sealable cover (SC) <br />models after concrete has dried. <br />Note: Nipple length is determined by measuring from <br />the bottom of the threaded portion of the base to the <br />bottom of the cover. Then subtract 2" for clearance, <br />height of adaptor and height of cap. Range of nipple <br />lengths that can be used in all of the OPW spill <br />containers: 4" minimum to 14" maximum. <br />Figure 1 <br />Finish Grade Slope V min. <br />Dust Cap <br />}" <br />t. Adaptor <br />Nipple <br />Bottom of <br />thread in base <br />�I� <br />I <br />Top of Riser Pipe <br />l <br />Riser Pipe <br />Figure 2 <br />OPW Fueling Components - Phase I Vapor Recovery System — VR -102-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.