Laserfiche WebLink
OPW Installation and Maintenance Instructions <br />OPW 1DK-2100 EVR Replacement Drain Valve <br />IMPORTANT: Please read these warnings and use <br />the assembly instructions completely and carefully <br />before starting. Failure to do so may cause product <br />failure, or result in environmental contamination due <br />to liquid leakage into the soil, creating hazardous <br />spill conditions. <br />IMPORTANT: Check to make sure the unit is intact <br />and undamaged and all parts have been supplied. <br />Never substitute parts for those supplied. Doing so <br />may cause product failure and void warranty. <br />WARNING -DANGER: Using electrically operated <br />equipment near gasoline or gasoline vapors may <br />result in a fire or explosion, causing personal injury <br />and property damage. Be sure that the working area <br />is free from such hazards, and always use proper <br />precautions. <br />NOTE: At all times when product is in the storage <br />tank keep the riser pipe capped, so the vapors <br />cannot escape into the environment. <br />The OPW 1DK is an optional drain valve <br />replacement kit for the OPW 1 Spill containers <br />series. It is designed to return incidental spillage of <br />liquid back to the underground storage tank. <br />HOW TO INSTALL <br />1.Remove and discard existing drain valve and 0 - <br />ring. <br />2.Clean any dirt or debris from the sealing surface <br />where the new drain valve will be installed. <br />3.Apply any common grease or light oil to the new <br />supplied O-ring. Assemble the O-ring into the spill <br />container base. <br />4. Insert the 1DK into the spill container O-ring. Be <br />sure that the drain valve seats flush with the floor <br />of the spill container base. <br />5.The pull lever of the 1DK MUST be positioned <br />halfway between the riser pipe nipple and the spill <br />container bellows. Rotate the drain valve until that <br />position is attained. <br />6. Secure the 1DK by installing the provided retaining <br />clips and nuts. Tighten the nuts to a torque of <br />11.5 ft -lbs min. to 13.5 ft -lbs max. <br />7.The drain valve is now installed and ready for <br />testing. <br />HOW TO TEST <br />Upon preliminary installation perform the California <br />Test Procedures. Their Test Procedures will check <br />the seals between the drain valve, nipple and <br />rotatable adapter. To to st the spill containers base <br />and bellows fill, the container with water. A drop in <br />the water level of 1/16" or more after one hour <br />means that a leak exists. To determine where the <br />leak is, look for a steady stream of bubbles coming <br />from one of the joints. NOTE: Do not drain the water <br />into the UST after the test is complete. Water must <br />be disposed of per local requirements for hazardous <br />waste. <br />If a leak is observed in the Test Procedure, check to <br />see that the drain valve poppet is sealing properly. <br />To do this, lift up the drain valve pull chain several <br />times to actuate the poppet. This will ensure that <br />the drain valve poppet is seating properly. If this <br />doesn't correct the leak remove the 1 DK valve and <br />inspect the O-ring for nicks or tears, replace if <br />needed, also clean the sealing surfaces of the spill <br />container base that the 1 DK valve and O-ring are <br />installed into. Reinstall 1 DK valve and repeat test. <br />If spill container passes the Test Procedure but does <br />not hold water then there is a leak in the bucket and <br />will need to be replaced. <br />Operation and Maintenance: <br />To open, pull drain valve chain up and hold open <br />until liquid is drained. To close, release chain <br />After each fuel delivery, the operator must remove <br />any standing fuel from the container. Fuel can be <br />removed by actuating the drain valve or with a <br />gasoline absorbing disposable towel. <br />Annually: Inspect and clean the interior of the spill <br />container and drain valve screen. Remove <br />accumulated dirt and grit. If the drain valve screen <br />becomes clogged, remove the valve, soak in water <br />and use high-pressure air to clean. Reinstall the <br />drain valve to its proper position and test the valve <br />per the appropriate California Test Procedure <br />ortant:Leave these instructions with Station <br />Flmp <br />erator. <br />OPW Fueling Components - Phase I Vapor Recovery System — VR -1 02-A <br />