Laserfiche WebLink
APR 22 2003 8:58AM HOASERJET 3200 <br />SWRCB. January 2002 <br />CITY of STOCKTON <br />CORP YARD <br />5. 9C1 1„V TESTIVG <br />p.2 <br />Page 3 of 7 <br />Test Method Developed By: [X ] Piping Manufacturer Industry Standard <br />Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ X Pressure ]Vacuum Hydrostatic <br />[ ] Other (Specify) <br />Testui ment Used: Pressure Gan e Eguj2ment Resolution: 0.20 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forf.ailed tests) <br />Piping Run #1, Hose I & 2 Piping Ru® #2 Pe In Run #3 PI In Run #4 <br />g <br />Piping Material: <br />Fiberg4m <br />Piping Manufacturer: <br />A.O. Smith <br />Pip!Diameter: <br />2"/3" <br />Length of Piping Run: <br />45 Feet <br />Product Stored: <br />DIESEL <br />Method and location of piping- <br />run isolation-. <br />3x2 Test Boots <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MINUTES <br />Test Start Time: <br />10:00 AM <br />Initial Reading (R1) <br />4 LBS. PSI <br />Test End Time: <br />11:00 A.M. <br />Final Reading (Rf): <br />4 LBS. PSI <br />Test Duration: <br />I HOUR <br />Change in Reading (Rf-RI) <br />-0- <br />Pass/Fail Threshold or Criteria: <br />-0- DROP <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forf.ailed tests) <br />