Laserfiche WebLink
.- .112/01/2005 14:34 209440433 EHD PAGE 01 <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Director H® R.R.H.S. 304 East Weber Avenue,Tbird Floor Carl Borlman,R.E.H.S. <br /> Al Olsen, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.DT <br /> Program Manager Telephone: (209)468-3420 Douglas W.Wilson, R.E.H.S. <br /> Laurie A. Cotulls, R.E.H.S. Margarct.Lagorlo,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 Robert McClellon,.R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jeff Unuesco, R,E.H.S. <br /> December 1,2005 <br /> Stockton Service Station Equipment Co. <br /> Attention:Mike Flores <br /> 908 N Union Street <br /> Stockton,CA 95205 <br /> RE: City of Stockton Corp yard,1465 S Lincoln Street,Stockton <br /> The San Joaquin County Environmental Health Department(SJCEHD)has received the <br /> permit to replace existing spill bucket on the Diesel tank at the above referenced location. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department,and the San Joaquin Valley Air Pollution Control <br /> District for applicable permits and requirements, <br /> 2. Any changes in information or scope of work must be submitted to SJCEH.D prior to <br /> commencing work. <br /> 3. At least one person who holds the International Code Council"UST <br /> Installer/Retrofifter"certification must be onsite AT ALL Mu when work is <br /> performed. <br /> 4. A"Certificate of Compliance for Underground Storage Tank Installation Form C" <br /> shall be submitted by the owner or the owners'agent(pursuant to California Code of <br /> Regulation(CCR)2635(d))before this upgrade will be considered complirtc by <br /> SJCEHD. <br /> 5. Contact Muniappa Naidu at(209)468-3439 to arrange the following inspection <br /> appointments;a 48-hour notice for inspection appointments is required, <br /> a. Corrosion protection:prior to backfilling around the spill buckets,corrosion <br /> protection of the risers must be verified, <br /> b. Overfill prevention-overfill prevention system in compliance with CCR 2635 <br /> (b)(2)must be verified. <br /> c. Spill Bucket: after concrete is poured,verify minimum 5-gallon capacity and <br /> conduct a 30-minute lake test in compliance with CCR 2635(b)(1). Proper <br /> drainage must also be verified. <br /> d. Third party tank integrity tests must be performed once concrete is poured, <br /> prior to the contractor signing off of the jobsite. The test results mustbe <br /> submitted to SJCEHD within 7 days of completing this project. <br /> 6. Permit expires 90 days from the approval date. Note:if an extension to the <br /> expiration date is required,this office prior to the expiration date must receive a <br /> written request. <br /> Thank you, <br /> 'nWn'tAH-4k <br /> Muniappa Naidu, SeniorREHS <br /> San Joaquin County <br /> Environmental Health Department <br />