Laserfiche WebLink
a ti <br /> SWRCB.January 2002 Page 7 of 7 <br /> City of Stockton <br /> Corp Yard <br /> Stockton,CA <br /> December 9,2005 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ]Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> f Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other S eci <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> Spill Box# Diesel Spill Box# Spill Box# <br /> Bucket Diameter: 11 INCH <br /> Bucket Depth: 14 INCH <br /> Wait time between <br /> applying 15 MINUTES <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 12:00 P.M. <br /> Initial Reading(R1): 10 INCH <br /> Test End Time: 12:40 P.M. <br /> Final Reading(Rf): 10 INCH <br /> Test Duration: 40 MINUTES <br /> Change in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or .001 <br /> Criteria: <br /> Test Result: [X]Pass [I Fail [; ] Pass [ ]'Fail [ ] 'Pass [ ] Fair [ ]Pass'' <br /> Fail' <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> NEW OPW IC2100 -- REPLACED FAILED UNIT <br />