My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 1:42:01 PM
Creation date
6/23/2020 6:54:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 Page 7 of 7 <br /> City of Stockton <br /> Corp Yard <br /> Stockton,CA <br /> December 9,2005 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested [ ] <br /> Test Method Developed By: [ ] Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> Spill Box# Diesel Spill Box# Spill Box# <br /> Bucket Diameter: 11 INCH <br /> Bucket Depth: 14 INCH <br /> Wait time between <br /> applying 15 MINUTES <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 12:00 P.M. <br /> Initial Reading(RI): 10 INCH <br /> Test End Time: 12:40 P.M. <br /> Final Reading(Rf): 10 INCH <br /> Test Duration: 40 MINUTES <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or .001 <br /> Criteria: <br /> Test Result: [X])Vass [I Fail Pass [ ]-Fail [ ] Pass [ ] Fail' [']Pass <br /> Fail <br /> Comments--(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> NEW OPW 1C2100 -- REPLACED FAILED UNIT (1C-2100) <br />
The URL can be used to link to this page
Your browser does not support the video tag.