Laserfiche WebLink
e <br /> SWRCB.January 2002 <br /> - Page 3 of 7 <br /> City of Stockton <br /> Corp Yard <br /> Stockton,CA <br /> November 21,2005 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X]Industry Standard [ ]Professional <br /> Engineer <br /> [ ]Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ]Hydrostatic <br /> [ ] Other(Spec) <br /> Test Equipment Used:Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run Piping Run Piping Run Piping Run Piping Run <br /> #3-4 #7-8 #1 -2 #5-6 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: A.O. Smith A.O. Smith A.O. Smith A.O. Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 35 ft. 35 ft. 35 ft. 35 ft. <br /> Product Stored: Diesel Diesel Unleaded Unleaded <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 11:05 A.M. 11:05 A.M. 11:05 A.M. 11:05 A.M. <br /> Initial Reading(Rl) 5 LB. 5 LB. 5 LB. 5 LB. <br /> Test End Time: 12:05 P.M. 12:05 P.M. 12:05 P.M. 12:05 P.M. <br /> Final Reading(Rf): 4 LB. 4 LB. 4 LB. 4 LB. <br /> Test Duration: 1 HOUR 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(Rf-R1) -0-Change in 1 -0-Change in 1 -0-Change in 1 -0-Change <br /> Hour Hour Hour in 1 Hour <br /> Pass/Fail Threshold or PASS PASS PASS PASS <br /> Criteria: <br /> Test Result: <br /> --FIX <br /> [ f Fail [X] Pass [ ] [X] Pass [ ] Fain [X]Pass [ 1 [ ]Pass { ]Fail <br /> Fail Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> INSTALLED BLUE LINE 3"X 2"SPLIT TEST BOOTS ON ALL FOUR LINES. REMOVED AFTER TEST. <br />