Laserfiche WebLink
a r <br /> SWRCB.January 2002 Page 7 of 7 <br /> City of Stockton <br /> Corp Yard <br /> Stockton,CA <br /> November 21,2005 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ ] <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br /> Test Method Developed By: [ ] Spill Bucket Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> Other(Specify) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other S eci <br /> Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br /> Spill Box# Diesel Spill Box#Unleaded Spill Box# Unleaded Vapor <br /> Bucket Diameter: 11 INCH 11 INCH 11 INCH <br /> Bucket Depth: 14 INCH 11-3/4 INCH <br /> Wait time between <br /> applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 10:18 A.M. 9:20 A.M. 9:20 A.M. <br /> Initial Reading(Rl): 10 INCH 8 INCH 9-3/4 INCH <br /> Test End Time: 10:25 10:00 A.M 10:00 A.M. <br /> Final Reading(Rf): 6 INCH 8 INCH 9-3/4 INCH <br /> Test Duration: FAIL 40 MINUTES 40 MINUTES <br /> Change in Reading(Rf-RI) <br /> Pass/Fail Threshold or FAIL PASS PASS <br /> Criteria: <br /> Test Result: []Pass [X1Fail [iX1 Pass [ 1 Fail 1x1 Pass [ 1 Fail [ ]Pass <br /> Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />