My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1 7. A i"TT TTV TNIMIDM A'TlrnlV <br />Facility Name: City of Stockton, Corporation Yard Date of Testing: March 11, 2010 <br />Facility Address: 1465 S. Lincoln Street, Stockton, CA 95206 <br />Facility Contact: Terri Williams <br />Phone: 209-937-7416 <br />Date Local Agency Was Notified of Testing: February 23, 2010 <br />Name of Local Agency Inspector (fpresent during testing): <br />7_ TESTING CONTRACTOR INFORMATION <br />z cpTT T RTTd"WV T 'TF C'TTN(_' 1MMUM A TION <br />Test Method Used: x Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc) <br />1 TANK #1 <br />DIESEL <br />2 <br />UNLEADED <br />TANK #1 <br />DIESEL RE -TEST <br />4 <br />Bucket Installation Type: <br />X Direct Bury <br />❑ Contained in Sump <br />X Direct Bury <br />❑ Contained in Sump <br />X Direct Bury <br />❑ Contained in Sump <br />❑ Direct Bury <br />❑ Contained in Sum <br />Bucket Diameter: <br />12 inch <br />12 inch <br />12 inch <br />Bucket Depth: <br />17 inch <br />14-1/2 inch <br />17 inch <br />Wait time between applying <br />vacuum/water and start of test: <br />1 minute <br />1 minute <br />1 minute <br />Test Start Time (Ti): <br />9:26 a.m. <br />9:26 a.m. <br />10:09 a.m. <br />Initial Reading (Rj): <br />1-1/4 inch <br />1-1/4 inch <br />1-1/4 inch <br />Test End Time (TF): <br />ENDED TEST <br />10:26 a.m. <br />11:13 a.m. <br />Final Reading (RF): <br />EARLY BUCKET FAIL <br />1-1/4 inch <br />1-1/4 inch <br />Test Duration (TF — TI): <br />1 Hour <br />1 Hour <br />1 hour <br />Change in Reading (RF - RI): <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />Less than 1/16 drop - <br />- 1/16 inch or less <br />1/16 inc-h or less <br />Test Result: <br />Pass X Fail <br />X Pass ❑ Fail <br />X Pass 0 Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />DIESEL TANK #1 REPLACED GASKET ON FILL ADAPTER. <br />RE -TESTED. FILL BUCKET NOW PASSING <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: etc0114—td Date: March 11, 2010 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.