Laserfiche WebLink
SWRCB. January 2002 <br />Job: City of Stockton <br />Corp Yard <br />1465 S. Lincoln St. <br />Stockton, CA <br />Date: April 9, 2009 <br />5. SECONDARY PIPE TESTING <br />Page 3 of 7 <br />Test Method Developed By: [ ] Piping Manufacturer [X] Industry Standard [ ] Professional <br />Engineer <br />[ ] Other (Spec) <br />Test Method Used: [X] Pressure [ ] Vacuum [ ] Hydrostatic <br />[X] Other (Specify) NITROGEN <br />Test E ui m-nt Used: Pressure Gauge Equipment Resolution: 0.20 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />NEEDED 3" X 2" SPLIT BOOTS IN SUMP <br />Piping Run <br />Diesel West <br />Piping Run <br />Diesel East <br />Piping Run <br />Regular West <br />Piping Run <br />Regular East <br />Piping Run <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />Piping Diameter: <br />2" —359 <br />2" —399 <br />2" —399 <br />2" —399 <br />Length of Piping Run: <br />30 ft. <br />30 ft. <br />30 ft. <br />30 ft. <br />Product Stored: <br />Diesel <br />Diesel <br />Regular <br />Regular <br />Method and location of <br />piping -run isolation: <br />Boot <br />Boot <br />Test Boot <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />12:00 p.m. <br />12:00 p.m. <br />1:30 p.m. <br />1:30 p.m. <br />Initial Reading (RI) <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />1:00 P.M. <br />1:00 .m. <br />2:30 p.m. <br />2:30 p.m. <br />Final Reading (Rf): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (Rf-RI) <br />-0- <br />-0- <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />-0- <br />-0- <br />-0- <br />-0- <br />Test Result: <br />[X] Pass[ ] Fail <br />[X] Pass [ ] Fail <br />[X] Pass [ ] Fail <br />[X] Pass[ ] Fail <br />[ ] Pass [ ]Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />NEEDED 3" X 2" SPLIT BOOTS IN SUMP <br />