My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br />Site: City of Stockton <br />Corp Yard <br />1465 S. Lincoln St. <br />Stockton, CA <br />Date: April 9, 2009 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 7 of 7 <br />Facility is Not Equipped With Spill/Overfill Containment_Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested [ ] <br />Test Method Developed By: [ ] Spill Bucket Manufacturer [X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [X ] Hydrostatic <br />[I Other (Specify) <br />Test Equipment Used: Caldwell Equipment Resolution: 1/32" <br />OPW 1200 <br />S ill Box Regular <br />Spill Box Diesel <br />Bucket Diameter: <br />12 inch <br />12 inch <br />Bucket Depth: <br />14-3/4 inch <br />16 inch <br />Wait time between <br />applying <br />pressure/vacuum/water and <br />starting test: <br />5 minutes <br />5 minutes <br />Test Start Time: <br />11:00 a.m. <br />11:00 a.m. <br />Initial Reading (R1): <br />14-3/4 inch <br />16 inch <br />Test End Time: <br />12:00 p.m. <br />12:00 p.m. <br />Final Reading (Rf): <br />14-3/4 inch <br />16 inch <br />Test Duration: <br />1 hour <br />1 hour <br />Change in Reading (Rf-R1) <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />-0- <br />-0- <br />Test Result: <br />[XI Pass Fail <br />[ Pass [ Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.