Laserfiche WebLink
SWRC& iadjjary 2002 <br />Job! city of Stbekton <br />Corp Yard <br />1,469 S. ILifieblit St. <br />Stop-Mcon, CA <br />)Dkto-! April 9, 2009 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: Piping Manufacturer [X] industry Standard <br />Engineer I Other (Specify) <br />1xi Pressure Vacuum <br />Test Method Used: M Other (51.7ecify) NITROGEN <br />Fouiornent Resolution: 0.20 <br />Page 3 of 7 <br />Codit"eaU — (iotludu ififottilation on repairs made prior to testing, and recommended follow-up for failed tests) <br />NEEDED V x 2* SMYT 190OTg IN sump <br />