My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:55:45 PM
Creation date
6/23/2020 6:54:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206-1941
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232272_1465 S LINCOLN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY/08/2015/FRI 08:30 AM CENTRAL WILDING FAX No. 12099377046 P. 005 <br /> HEGLIVEL <br /> UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING 1&661' <br /> For rase by Mid=Member AgeneW or where approved, <br /> pproved by your Local IRONMENTAI <br /> Authority Cited,• 7Yfie 23,Div.3,Ch, 16 California Code ofAegulations(C <br /> Facility N4me-- Ott of Stockton CORP Yard <br /> Facility Site Address: 1465 S. Lincoln Street City: Sionletnin <br /> Section 2715 of Title 23, California Code of Regulations,requires that Designated Underground Storage Tank Operators <br /> provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br /> underground storage tank(UST)systems.This training must be provided by July 1.2005,and every 12 months thereafter. <br /> Vor facility employees hired after July 1,2005,the initial training must be provided within 30 days of the date of hire.At <br /> least one of the facility employees present during operating hours must have current training.This training must include,but <br /> is not limited to,the following items as specified in 23 CCR Sections 2715(t)(1)and(2): <br /> Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br /> The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan, <br /> The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> Name(s)of contact person(6)for emergencies and monitoring equipment alarms; <br /> 0 For facilities that are not routinely staffed,facility employee responsibilities as specified in the training program <br /> approved by the local UST regulatory agency. <br /> 23 CCR§2715(f)(3)requires that a list of employees who have been trained by the Designated Underground Storage Tank <br /> Operator(s)be maintained on-site,or off-site at a madily-avallable location ifgRpEgyed by the local agme.and provided to <br /> the local agency upon request.Completion of this form will satisfy UST training record keeping reqtdroments.The following <br /> einployees have been trained as required by 23 CCR Sections 2715(f)(1)and(2): <br /> a lity Employee Name Tramift-Date Aire Date' Tri 46 Namit /I <br /> 6WK WA4-- <br /> h� . <br /> I -Y-o i <br /> 2,- lu -7 <br /> Q"2f — ,A <br /> (Confinued on reverse) <br /> if hired after July 1.2005, <br /> "frainer miast Be a ewmt Desipatod UST Operator for the fheility of the time of training. <br /> UN461-1/2 wwwmmldomorg 07113105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.