Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checklist: <br /> rgYes <br /> El Is ththe audible alarm operational? <br /> Yes ❑ No* Is e visual alarm operational? <br /> kT Yes 13 No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Gd'Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? _ <br /> ❑ Yes El No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Id N/A operational? <br /> [O'Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to opera , or is electrically disconnected? If yes: which sensors.initiate <br /> positive shut-down? (Check all that apply) Sump/Trench Sensors; MDispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensoi failure/disconnection? es; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overf <br /> ll warning device (i.e. no <br /> ZN/A mechanical overfill prevention.valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* Ef No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes, describe causes.in Section E,below. <br /> Y s ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> i <br />