Laserfiche WebLink
L E <br />1CMAXIEPION PPECISION TESTING, INC <br />PO Box 13059 Sacramento, Ca 95813-3059 <br />(916) 927-1557 800-660-9443 <br />FAX: (916) 927-7345 <br />ConWactors #804890 <br />Pressure Decay Test <br />TP 201.3 <br />1: 7 =Hi ILI 0111111111111 <br />Phone: <br />Phasel <br />I * - . oil OrZA <br />E <br />1157 101 <br />Address: 1875 Q!psel Dr, Suite 12 <br />Sacramento. Ca 95838 <br />Phone- (916)927-1557 - <br />• C.4 <br />N0771 ES for TANK #1 Af_/Z NOZZLES forTANK #3 <br />NOZZLES for TANK #2 W& NOZZLES for TANK #4 <br />Balance "Nozzle End" hoses must be drained prior to test. Number of hoses over 100 <br />Tank Information NOW <br />2. Actual Tank Capacity, gallons <br />3. Gasoline Volume, gallons <br />i'MIMM-woffilml WiTZIE'At WW'���WKIXWM <br />N"en indudon point Phase I vapor coupler or Phase If vapor Riser IM Phase I= - $1 Phase 11 <br />4��110 Enter caftation Date for pressm Devise (90 days) <br />dog— Enter Initial tank ullap pressum (Vent if over 0.5 in. wc) <br />7�41 Enter lowmeter rate, F(must be 1 to 5 CFM) <br />4'0 Enter calculated ullage Fill Time (t2) <br />-2-<.) Enter actual fill -time <br />Enter endng value of it test (Must be 0.01 in, wc or less) <br />gap <br />t2= V <br />115221F <br />Tester ID: <br />Test Date: <br />— / - ,2� <br />