My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_1988-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 9:38:51 AM
Creation date
6/23/2020 6:54:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2007
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232353_147 E LATHROP_1988-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — PAGE 2 <br />VI DISPENSER MONITORING <br />M50.MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) MODEL #: 1019Y390_7108 Msz. <br />PANEL MANUFACTURER: Ms3. <br />LEAK SENSOR MANUFACTURER• Ua, ef r MODEL #(S): h d1-52141 e^ ! �j Mss. <br />a. YES ❑ b. NO "tss. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS. M16. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />'a. YES El b. NO <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />Mss. <br />❑ 2.kNICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR $VALVE IN CASE OF LEAK M59 <br />#1 ASSEMBLY MAN ACTURER: MODEL #(S): <br />Mho. <br />❑ 3.VISUAL MON E: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) <br />❑ 4. NO DISPE N161. <br />❑ 99 OTHER (Speclfj�%� <br />VII. ENHANCED LEAK DETECTION M70 <br />❑ <br />I. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />Mso. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Y) <br />1. C1IN <br />THIS UNDERGROUND STORAGE TANK MONITORG PLAN (Required <br />2. ❑ OP TING MANUAL FSR E EC TRONIC MONITORING EQUIPMENT e cared '/ <br />3. ❑ THE FACIL Y' F. T MANAGEMENT PRACTI— (Reautred as of 7/1/2004) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANKREGULATIONS <br />5. ❑ CALIFO UNDERG GE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" mts1. <br />99. ❑ OTHER (Specify): <br />th all of the above documents relevant to their job duties and can access those documents when needed. <br />Personnel with UST monitoring responsibilities are familiar wi <br />B Jul 1, 2004, this facility will have a "Designated UST O erator" who has passed the operator exam administered by the International Code Council (ICC). By July <br />1, 200 , an annus y e eslgnated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with re-ard ls. <br />Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired or after Jul 1 2004, the initial trainin will be conducted within 30 days of the date of hire. <br />on <br />Please use this section to include any additional UIX. COMMENTS/ADDITIONAL INFORMATION ; M85 <br />ST system monitoring -related information (e.g., additional information required by your local agency): <br />X. PERSONNEL RESPONSIBILITIES <br />�S OF 7/1/2004, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR 2715 b . <br />M. OWNER/OPERATOR SIGNATURE, <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. Mgt <br />REPRESENTING DATE: <br />TOR NAME (print): <br />(Agency Use Only) This plan has been reviewed and: <br />Local Agency Signature: <br />Comments/Special Conditions: <br />U Owner M90.6❑Operator � � , L <br />M927 OWNER/OPERATOR TITLE: <br />/yw w <br />❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Date: <br />07/23/03 <br />SJCEHD-d (07/03) - 3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.