Laserfiche WebLink
EMERGENCY RESPONSE PLAN FORM <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring pTogrm 1burit be kept at the UST location at 811 times. The information on this monitoring program are <br />conditions of the operating perrnit. The permit bolder must notify (the —local -Al within 30 days of any changes to the <br />monitoring procedures, unless required to obtain approval before Making the change. <br />Required by Sections 2632(4) and 264 1 (h) CCR <br />FacilitYName: GwArs . POOP <br />A <br />Facility Address: <br />1. if an unauthorized release occurs, how will the hazardous substance be cleaned up? <br />Note: if released hazardous substances reach the environment, Increase the fire or <br />explosion hazard, are not cleaned up from the secondary containment within 8 hours, <br />or deteriorate the secondary containment, the ocal affenc must be notified within 24 <br />hours. <br />vralv spi AvD C- L <br />V16 A A Af AJ I <br />2, Describe the proposed methods and equipment to be used for removing and properly <br />disposing of any hazardous substances. <br />V.,drff Aka.,r ALA.In <br />3. Describe the location and availability Of the required cleanup equipment in item 2 above. <br />0 f-koawl' , <br />4. Describe the maintenance schedule for the cleanup equipment. <br />9 k' G&'V V, Q T ftjs-ftl 16-0-P --- Wu T& Aj$0p&j&-r To V)F! <br />5. List the name(s) and title(s) of the persol responsible for authorizing any work necessary <br />under the response plan: JA VAIL KAl"00T —3 uj evil X.-- 1+01 <br />l0kiNt I'L Cfla. CA-r-rAhvAcW W16:MdXt9#- <br />