My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1988-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_1988-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2024 9:38:51 AM
Creation date
6/23/2020 6:54:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988-2007
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232353_147 E LATHROP_1988-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SITE SPECIFIC SAFETY PLAA <br />INTRODUCTION <br />This document describes the health and safety procedures for the <br />activities planned in nPrfr <br />oming a preliminary site investigation at <br />All personnel and <br />subcontractors will follow this plan. The prime responsibility for <br />employee safety lies with each company that is involved in the work <br />for it's own employees. It is expressly intended that all project <br />work will comply with applicable secti ons of the California <br />occupational Health and safety code. All parties working on this <br />project Will maintain a general resoonsibility to identify and <br />correct any health and safety hazards and are responsible -J-c).;- <br />in a safe manner. <br />Key Personnel <br />P., personnel who kill have overall responsibility for the safe <br />opera =ion c= this are: <br />Site Contact: 6 U C /-° f3 D P/ <br />A ivy N5�- <br />Project manager aid !{ j� C /� U w }' <br />Site Safety Of_i ce=, <br />Aire iV Contractors (?Co) 461 5337 <br />lax 401 6342 <br />Project Ma_.acer and Safey Officer Responsibilities: <br />* TO conduct ini°ia1 site safety _raining for all project <br />field team members as descr_ped 1n tn_S QOC'lment, <br />* To assure all field team personnel have read and <br />Unde= s tc d the Hea l �, and <br />, <br />* TO assure that all work perfo--med OII -h; s projec 1s <br />conducted is a safe manner, <br />* To coordinate with field personnel fire -watch, traffic <br />c <br />control and site security, <br />SITE SkFETY Pure (SSP) -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.