My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 2:40:43 PM
Creation date
6/23/2020 6:54:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232353_147 E LATHROP_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 INSTALLA N <br />2.1 Inspect the Equipment-- - - - <br />Examine the shipment immeaiateiy upon arrival to make certain there has been no damage or loss in <br />transit. Make sure that all the component parts, including keys and optional equipment (if any), are <br />accounted for. Check and save the Packing Slip, Bill of Lading, Invoice, and all other documents <br />included in the shipment. Damaged or lost equipment must be reported to the carrier. Any damage or <br />loss that may occur in transit is not covered under the Wayne/Dresser Warranty. <br />2.2 Island Construction, Dispenser Anchoring, and Piping <br />Product lines must avoid the creation of vapor in the lines and deliver a minimum pressure of 25 psi at <br />the dispenser inlet when all dispensers at the station dispensing the same product are operating. <br />A concrete foundation must be provided for the dispenser. Do not pour concrete around product lines or <br />electrical conduit risers. <br />Anchor bolts must be installed in the island to allow the dispenser to be bolted down in accordance with <br />NFPA requirements. The base of the dispenser contains six bolt hole slots (5/8 inch by 2 inch) for <br />anchoring the dispenser to the island. Use of all anchoring locations is re -commended. Position <br />the anchor bolts in accordance with the dimensions shown on -the Installation Instruction drawing for the <br />dispenser model. These drawings are located in Appendix B. <br />Vertical supply risers and electrical conduits must be located per the Installation Instruction for the <br />appropriate model. Proper height must be maintained to avoid undue stress on the dispenser. <br />For E85 Ovation models, product piping, pipe nipples, etc., containing Ethanol fuel must be Ethanol <br />compatible. See the information in Section 1.1 on page 1. <br />For convenience, a 6" high pedestal is available to install under the dispenser base at locations where <br />there are no islands. The pedestal, shown in Figure 2-1, can be ordered separately. See the complete <br />assembly drawing 888813 in Appendix B. <br />Figure 2-1 Pedestal The pedestal can be ordered separately as needed. <br />5' <br />February 2008 Part No. 920559 Rev F <br />
The URL can be used to link to this page
Your browser does not support the video tag.