Laserfiche WebLink
MONI <br />RING SYSTEM CERTIN TION <br />se By .ill Jurisdictions 111itllin the State of Cali. , is <br />.duthority Cited: Chapter 6.7° Hearth and Safety Code; Chapter /6, Division 3, Title 23, California Code 6FJgtdn io '3 <br />This form must be used to document testing and servicing of monitoring equipment. A separate certify CkrWW1 69_ -{ <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this fo ��10&PV , o <br />the tank system owner/operator. The owner/operator msubmit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Information <br />Facility Name: 7P -,J (=S Bldg. No.: <br />Site Address: / G //ca . <br />City: e_ -,q -7,' <br />Zip: <br />Facility Contact Person: Contact Phone No.: (G �-� )- <br />Make/Model of Monitoring System: j® 7L• j� � � Date of Testing/Servicing: «/ / C, <br />B. Inventory of Equipment Tested/Certified <br />Check tile aeproeriate boxes to indicate s ecitic a ui ment ins ectedtseryiced: <br />Tank ID: 1 <br />Tank ID: / - <br />-�Nn-Tank Gauging Probe. Model: at���c, / <br />1� Annular Space or Vault Sensor. Model: <br />49 -In -Tank Gauging Probe. <br />Model: y' <br />49,•Piping Sump / Trench Sensor(s)- Model: <br />�AMUIar Space or Vault Sensor. <br />d Piping <br />Model: c , 2 <br />❑ Fill Sump Sensor(s)`.. Model: <br />Sump / Trench Sensor(s). <br />❑ Fill Sump Sensor(s). <br />Model: <br />Model: <br />0 -Mechanical Line Leal: Detector. Model:Tte ) <br />.Mechanical Line Leak Detector. <br />Model: <br />El Electronic <br />ic Line Leak Detector. Model: <br />LI Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor, <br />Model: <br />❑ Other (specify equi meat ty e and model in Section Eon Page 2). <br />❑ Other (specify equipment ty e and <br />model in Section E <br />Tank ID: �,/ <br />n -Tank Gauging Probe. Model: <br />Tank ID: <br />on Page 2). <br />I:Annular Space or Vault Sensor. Model: e? T C> <br />❑ In -Tank Gauging Probe. <br />Annular Space or Vault Sensor. <br />Model: <br />—El <br />N:LPiping Sump / Trench Sensor(s). Model: 4 8 <br />' <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />gif-Mechanical Line Leak Detector. Model: �=" �w;Z <br />❑ Fill Sump Sensor(s). <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify e uipment ty e and model in Section E on Pa 2). <br />❑ Tank Overfill / High -Level Sensor. <br />❑ <br />Model: <br />e <br />Other (s ecify equipment t E on Pa <br />e and model in Section e 2). <br />Dispenser ID: <br />ZYCDispenser Containment Sensor(s). Model: <br />Dispenser ID: <br />ispenser Containment Sensor(s). <br />Model: <br />A::Sliear Valve(s). <br />❑ Dispenser Containment Float(s) and Chains) <br />shear Valve(s). <br />er <br />❑Dis enser Contaimnent Floats) and <br />Chain(s). <br />Dispenser ID: •i,' <br />'C1,Dispenser Containment Sensor(s). Model: <br />Dispenser <br />c:> <br />tihev Valve(s). <br />❑Dispenser Containment Sensor(s). <br />Model: <br />❑ Shear Valves) <br />❑ Dis enser Containment Float(s) and Chain(s). ❑Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: Dispenser ID: <br />,LDispenser Containment Sensor(s). Model: ? terry' ❑ Dispenser Containment Sensor(s). Model: <br />hear Valve(s). ❑ Shear Valve(s). <br />❑Dispenser Containment Float(s) and Chain(s). ❑ Dispenser Containment Float(s) and Chain(s). <br />;If the facility contains more tanks or dispensers, copy this form. Include information <br />bfor every tank and dispenser at the facility. <br />51 'C 4- / " - /1-J. I, �, _tom <br />C. Certification - I certify that the equipment identified in this ocument was inspectedtserviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' cheeldists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all drat apply): System set-up larm history report <br />Technician Name (print): AVi 12 L Signator : <br />Certification No.: 3 ✓�7'3-ar <br />License. No.: ATL � n $— I <br />Testing Company Name: /y r bA TE5 p-• Phone No j tog %'��% - 6 <br />Site Address: /Gj fry ; rj �� Date of Testing /Servicing: -/�/ <br />Page i ol'3 f!3/Ot <br />R'Ionitoring System Ccr•tilic,rtion <br />- _ - _ ___ <br />D. Results ccf Testis-/ Servichpo- <br />