My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 2:40:43 PM
Creation date
6/23/2020 6:54:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0232353
PE
2361
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
01
SITE_LOCATION
147 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232353_147 E LATHROP_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Lqu* -e-Clieck this box if g tank au ging is used only for inventory control. <br />g" <br />LJCheck this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaining equipment is used to perform leak detection monitoring <br />Complete the following checklist: <br />❑ Yes ❑ No*tHaall input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No*e all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leath Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />m lets the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />❑ No* <br />Yes <br />V❑ <br />13 No* <br />Yes <br />No* <br />❑ N/A <br />❑ Yes <br />❑ No* <br />I PK N/A <br />❑ Yes <br />❑ No* <br />' N/A <br />❑ Yes <br />❑ No* <br />' N/A <br />❑ Yes <br />❑ No* <br />M_ N/A <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD.detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? AF <br />For electronic LLDs, does the turbine automatically shut Off if any portion of the monitoring system malfunctions <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />W. ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 <br />o3/Ol <br />
The URL can be used to link to this page
Your browser does not support the video tag.