Laserfiche WebLink
AL <br /> { SAN JOAQUOU COUNTY ENVIRONMENTAL HEALTH D _ =M01' <br /> UNDERGROUND STO' TANKMONITORING LAN -PAGE 1 <br /> TYPE OF ACTION I.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> M02. <br /> PLAN TYPE 19 MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> 1 FACILITY ID#(Agency Use Only) 1 " 1 - 1 - `� O <br /> M03, <br /> FACILITY NAME Too O U t< <br /> Moo. CITY p AtOs- <br /> FACILITY SITE ADDRESS 1 f_& <br /> FACILITY <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in <br /> M0& <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. u07 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information.include it with this plan. <br /> IV. TANK MONITORING <br /> Mlo. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d UNDpE}R�VACUUM T� 1 <br /> i PANEL MANUFACTURER: �j1� �tl <br /> LEAK SENSOR MANUFACTURER: LIFE D t� Q�T AP14' MODEL#(S): At 3 <br /> F12.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANx(S) MIT <br /> M16. MODEL#: <br /> PANEL MANUFACTURER: <br /> Mfg. MODEL#(S): M19. <br /> IN-TANK PROBE MANUFACTURER: M20. <br /> LEAK TEST FREQUENCY: ❑ a CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M21 <br /> ''! ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> M, 22. M_3. <br /> c.OTHER(Specify): <br /> PROD D TESTS: Ela.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ Mza <br /> ❑ 3.WVENTORY RECONCILIATION ❑ a MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a 36 HOURS ❑ <br /> b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 11425. Mp <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a DAILY ❑ b.WEEKLY(Rcqui"agcncyapproval) <br /> Hex. <br /> ❑ <br /> 99.OTHER(Specify):-- <br /> V. <br /> Specify): V. PIPE MONITORING <br /> M30. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAIIATIENT <br /> yJW <br /> SECONDARY CONTAINMENT IS: a DRY [Ib.LIQUID FILLED El c.UNDER PRESSURE ❑ d UNDER VACUUM <br /> Af31. <br /> PANEL MANUFACTURER: Vel (�j]� M32. MODEL#: _ .0'724390-��' f'S <br /> (f M34. MODEL#( J Y M35. <br /> YP <br /> LEAK SENSOR MANUFACTURER: M36. <br /> a.YES b.NO <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ M37 <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? [I a YES Elb.NO <br /> [�K.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICASrOR SHUTS OFF f <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED DT J- <br /> MLLDMANUFACTURER(s): Q�`C1QQETQ0 Mag MODEL#(S): S tLJ <br /> I ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> 1Mal. <br /> ELLD MANUFACTURER Moo. MODEL#: <br /> Mae. <br /> PROGRAMMED LINE INTEGRITY TESTS: [IINIM <br /> a.MUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1&P.IL <br /> M43 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b.NO M44' <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? C] a YES ❑ b.NO <br /> l ❑ 4.INTEGRITY TESTING U45. Mab. <br /> TEST FREQUENCY ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5NISUAL MONITORING DONE: ❑ a_DAILY ❑ b.WEEKLY* ❑ e.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47- <br /> +..Requira agcnoy approval "Alkmcd for monitoring of unburied anogmcy gcncrwor fuel Piping only perwc§25291.5(b),(3) <br /> ❑ 6 PIPING IS SUCTION pIP AI t MEETING ALL REQ NTS FOR,EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7 NO PROD # OR OTE FtI L PIPING LS CONNECTED TO THE iJST(s) g <br /> ti 4 <br /> Og_3111 <br /> { <br /> f <br />