Laserfiche WebLink
Ah Ah <br /> LIWIED PROGRAM CONSOLIDATED FOR <br /> TANK <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VI.PIPING CONSTRUCTION(Check all that apply) Page of <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE J®1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458 ❑1.PRESSURE ❑2. SUCTION [13.GRAVITY 459 <br /> CONSTRUCTION/ ❑1.SINGLE WALL ❑3.LINED TRENCH [199.OTHER 460 ❑1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER AO Smith' 461 MANUFACTURER_ 463 <br /> ❑1.BARE STEEL J®6.FRP COMPATIBLE w/100Y METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W1100%METHANOL <br /> [12.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑UKNOWN ❑2. STAINLESS STEEL [17.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99. OTHER ❑3. PLASTIC COMPATIBLE WI CONTENTS ❑8.FLEXIBLE(HDPE) ❑99. OTHER <br /> ❑4.FIBERGLASS ❑8.FLEXIBLE(HDPE) [14. FIBERGLASS [19.CATHODIC PROTECTION <br /> [15.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 ❑5. STEEL W/COATING ❑95.UNKNOWN 465 <br /> VII.PIPING LEAD DETECTION(Check all that apply)(A description of the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> F-11, ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF FOR Ell. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF FOR <br /> LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDIBLE AND VISUAL LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDIBLE AND VISUAL <br /> ALARMS. ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> [13. ANNUAL INTEGRITY TEST(0.1GPH) [13. ANNUAL INTEGRITY TEST(0.1GPH) <br /> E14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all thatapply) <br /> E-15. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING INTEGRITY [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> ❑8. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND <br /> (Check one) (Check one) <br /> ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c NO AUTO PUMP SHUT OFF <br /> 1011. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUTOFF OR ❑11. AUTOMATIC LEAK DETECTOR <br /> RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS 013. CONTINUOUS SUMP SENSOR+AUDIBLE ANDVISUALALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF+AUDIBLE AND ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF+AUDIBLE AND <br /> VISUAL ALARMS VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW SHUT OFF OR ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> RESTRICTION <br /> E-116. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [117. DAILY VISUAL CHECK ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ®1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 ❑2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> August 1999 J ❑3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR DISPENSER+ ❑6.NONE 469 <br /> AUDIBLE AND VISUAL ALARMS <br /> IX,OWNER/OPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OFOW OPE O DATE 470 <br /> January 28, 2005 <br /> NAME OF OWNER/OPRATOR(print) TITLE OF OWNER/OPERATOR 472 <br /> Mike Karvelot, for Quik Stop Markets, Inc. Director of Environmental Affairs <br /> Permit Number(For local use only) 473 Permit Approved(For local use only) Permit Expiration Date(For local use only) <br /> 475 <br /> UPCF(1/99 revised) Formerly SWRCB Form B <br />