My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:16:46 PM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2005-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/04/2008 09:19 916-373-1172 WALTON ENGINEERING <br />0 is <br />k rON <br />NGINEEN#NNG9 ANC. <br />Garrett Backus <br />San Joaquin County <br />Environmental Health Dept. <br />600 East Main. Street <br />Stockton, CA 95202 <br />Re: Quik Stop Market #152 <br />1721 S. Cherokee Ln., Lodi <br />(SR0054219) <br />Dear Garrett: <br />June 4, 2008 <br />As discuss today by tel.ephone, we need to add a new scope item to this project. <br />The existing shallow Bravo UDC's do not have the dedicated low voltage conduit we <br />need for the new ISA data cables. <br />We are proposing to extend the existing low -voltage conduit from the 91 tank annular <br />junction box to each of the two (2) UDC's. <br />We will. need to install a new penetration fitting at each LTDC's to accommodate this new <br />conduit. We will be using the Bravo EBS For this purpose. A specification sheet is <br />enclosed. <br />PAGE 02 <br />Since we will be excavating at the two (2) UDC's we assume that you will want to see a <br />water test on those three (3) components prior to backfill.. We will also conduct a <br />standard S13989 test on those items at the completion of the project and forward a copy of <br />that test .report to you. <br />Please let the know if you have any questions or require any additional items. <br />Thanks for all of your help on this project. <br />Sincerely, <br />WALTON ENGI;NEEMG, INC. <br />Michael E. Walton <br />President <br />916-3731.152 <br />3900 Commerce Drive, West Sacramento, CA 95691 • (916) 372-1888 • Fax 373-1172 <br />Mailing Address: P.O. Box 1025, West Sacramento, CA 95691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.