My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:16:46 PM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2005-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />06/04/2008 09:19 916-373-1172 WALTON ENGINEERING PAGE 04 <br />Aft <br />1P <br />B-2000 Dispenser Containment <br />NOTE: all surfaces should be as clean as possible prior to <br />tightening any bulkhead fittings into place. <br />I <br />VAPOR RECOVERY PE1WET',':AaMGMTMl-A-' <br />INSTALLATION <br />NOTE: contaitment boxes are marked "A" for junction box side; <br />refer to dispenser manufacturer's, manual for appropriate vapor <br />position. <br />1. On the bottom, inside the B-2000 box, locate the position of the <br />vapor recovery line. <br />2. A 2-3/8" diem hole size is required for the B -27 -SET -3 fining. <br />Cut the bole using appropriate too]. CAUTION: make sure that <br />there is adequate space for tightening the B -27 -SET -3 fitting. <br />Ahvaysfollowproper safety procedures when cuffing into steel <br />3. Clean the hole of sharp edges using round file,-,. Remove locking <br />nut and one gasket from fitting. Insert fitting flush with exterior <br />of containment box. <br />4. Insert a gasket and a washer from the inside of the box until these <br />are flush to the bottom of the box. Fasten the nut to the fitting. <br />NOTE: The B-27 SET -3 fitting has a 3" secondary hose <br />termination adapter. Rigid piping may be used for primary and <br />secondary line connections. The B-27 SET -4 fitting has a 3" <br />female threaded adapter for secondary rigid piping. Consult <br />factory <br />ELECTRICAL PENETRATION FITTINGS If <br />INSTALLATION <br />VAPOR RECOVERY FITTING (B -27 -SET -3) <br />60 <br />d"r <br />"ali 11 R - IAl M-1 W41!11 o� <br />IMPORTANT, electrical, fittings are used to provide a continuous <br />I" or 3/411 <br />run to the electrical seal off, Containment boxes are marked <br />conduit <br />"A" for junction box side; refer to dispenser manufacturer' <br />manual for junction box position. <br />ES -1 <br />NOTE: electrical fittings such as Bravo's EBS fittings, are <br />electrical seal <br />available for I" and 3/41' conduit. For further inforrnation, consult <br />Rose clamps <br />your Bravo distributor. <br />1. On the bottom, inside the B-2000 Box, locate the position of the <br />conduit. C4U770N.- make sure that there is adequate space <br />for tightening the .EBS fitting: Always follow proper safety <br />Locking nut <br />procedures when cutting into steel <br />2. A 2" diam hole size is required for the EBS fitting. Cut the bole <br />using an appropriate tool. <br />O-ring " Interior of <br />3. Clem the hole of sharp edges using round files. Remove electrical <br />containment box <br />seal, locking nut and o -ring gasket from fitting. Insert fitting <br />r <br />flush with exterior of containment box. <br />Gasket <br />4, Insert o -ring gasket and a locking nut from the interior of the box <br />Fitting body <br />until the is fitting hush to contaiment box. Fasten the nut onto <br />. fl <br />the fitting. <br />S. Pass the electrical conduit through the FIBS, Hose clamp the ES- <br />I to the EBS body and conduit. <br />$-B <br />W" <br />
The URL can be used to link to this page
Your browser does not support the video tag.