Laserfiche WebLink
0 <br />06/04/2008 09:19 916-373-1172 WALTON ENGINEERING PAGE 04 <br />Aft <br />1P <br />B-2000 Dispenser Containment <br />NOTE: all surfaces should be as clean as possible prior to <br />tightening any bulkhead fittings into place. <br />I <br />VAPOR RECOVERY PE1WET',':AaMGMTMl-A-' <br />INSTALLATION <br />NOTE: contaitment boxes are marked "A" for junction box side; <br />refer to dispenser manufacturer's, manual for appropriate vapor <br />position. <br />1. On the bottom, inside the B-2000 box, locate the position of the <br />vapor recovery line. <br />2. A 2-3/8" diem hole size is required for the B -27 -SET -3 fining. <br />Cut the bole using appropriate too]. CAUTION: make sure that <br />there is adequate space for tightening the B -27 -SET -3 fitting. <br />Ahvaysfollowproper safety procedures when cuffing into steel <br />3. Clean the hole of sharp edges using round file,-,. Remove locking <br />nut and one gasket from fitting. Insert fitting flush with exterior <br />of containment box. <br />4. Insert a gasket and a washer from the inside of the box until these <br />are flush to the bottom of the box. Fasten the nut to the fitting. <br />NOTE: The B-27 SET -3 fitting has a 3" secondary hose <br />termination adapter. Rigid piping may be used for primary and <br />secondary line connections. The B-27 SET -4 fitting has a 3" <br />female threaded adapter for secondary rigid piping. Consult <br />factory <br />ELECTRICAL PENETRATION FITTINGS If <br />INSTALLATION <br />VAPOR RECOVERY FITTING (B -27 -SET -3) <br />60 <br />d"r <br />"ali 11 R - IAl M-1 W41!11 o� <br />IMPORTANT, electrical, fittings are used to provide a continuous <br />I" or 3/411 <br />run to the electrical seal off, Containment boxes are marked <br />conduit <br />"A" for junction box side; refer to dispenser manufacturer' <br />manual for junction box position. <br />ES -1 <br />NOTE: electrical fittings such as Bravo's EBS fittings, are <br />electrical seal <br />available for I" and 3/41' conduit. For further inforrnation, consult <br />Rose clamps <br />your Bravo distributor. <br />1. On the bottom, inside the B-2000 Box, locate the position of the <br />conduit. C4U770N.- make sure that there is adequate space <br />for tightening the .EBS fitting: Always follow proper safety <br />Locking nut <br />procedures when cutting into steel <br />2. A 2" diam hole size is required for the EBS fitting. Cut the bole <br />using an appropriate tool. <br />O-ring " Interior of <br />3. Clem the hole of sharp edges using round files. Remove electrical <br />containment box <br />seal, locking nut and o -ring gasket from fitting. Insert fitting <br />r <br />flush with exterior of containment box. <br />Gasket <br />4, Insert o -ring gasket and a locking nut from the interior of the box <br />Fitting body <br />until the is fitting hush to contaiment box. Fasten the nut onto <br />. fl <br />the fitting. <br />S. Pass the electrical conduit through the FIBS, Hose clamp the ES- <br />I to the EBS body and conduit. <br />$-B <br />W" <br />