Laserfiche WebLink
May 15, 2008 <br />10 0 <br />San Joaquin County <br />Environmental Health Department <br />•!0 East Main Street <br />Stockton, 95202-3029 <br />Website: www.sjgov.org1ehd <br />(20 9) 468-3420 <br />09) 464-0138 <br />Michael Walton <br />Walton Engineering, Inc. <br />P.O. Box 1025 <br />West Sacramento, CA 95691 <br />Fax: (916) 373-1172 <br />DIRECTOR <br />Donna Heran, RENS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, RENS <br />PROGRAM COORDINATORS <br />Carl Borgman, REHS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Sent via Fax and Mail <br />Subject: Quik Stop #152,1721 S Cherokee Lane, Lodi, CA (SR0054219) <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for permit to perform an EVR phase II upgrade and cold start. The permit has <br />been approved with the following conditions. <br />Conditions of approval: <br />1. Contact the local fire department, local planning or building department and the San <br />Joaquin Valley Air Pollution Control District for any applicable permits. <br />2. Any changes shall be submitted to the San Joaquin County Environmental Health <br />Department (EHD) for approval prior to commencing work. All new addenda supercede <br />the previous ones. <br />3. Before the alarm history is cleared by the "cold start", a current printout must be <br />created and available for EHD inspection. Inspection may occur during the monitoring <br />system functionality test. <br />4. Contact Garrett Backus (209-468-2986) to arrange the following inspection(s) (a 48-hour <br />notice is required): <br />a. The EHD must witness the testing of the functionality of the monitoring system <br />to ensure that monitoring has been restored to meet the requirements of <br />California Code of Regulations Title 23 and the Health & Safety Code. <br />5. If concrete is being broken near the UST, pipeline and tank integrity testing must be <br />performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br />guidelines. Results must be received by the EHD within seven days of returning the <br />facility to operating condition. <br />6. An "Underground Storage Tank Certification of Installation/Modification" form (form C) <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(4)] before <br />this upgrade will be considered complete by EHD. <br />7. All components must be certified by an independent testing organization and labeled as <br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See California Code of <br />Regulations (CCR), Title 23 Chapter 16 Table B for complete list). The component must <br />bear the appropriate mark as required by the independent testing organization. <br />Page 1 of 2 <br />