My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:16:46 PM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2005-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah <br /> PRODUCT PIPING SUMP TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: O Pressure O vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Tank#1 Tank#2 Tank#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Sump material FRP FRP FRP <br /> Sump diameter (inches) 42 42 42 <br /> Sump depth (inches) 49 49 45 <br /> Height from tank top to highest 7 7 7 <br /> piping penetration (inches) <br /> Height from tank top to lowest 9 9 9 <br /> electrical penetration (inches) <br /> Method of sump attachment to tank Manway Manway Manway <br /> Condition of sump prior to testing Dry Dry Dry <br /> Portion of sump tested Entire Entire Entire <br /> Is system programmed for fail-safe operation? Unknown Unknown Unknown <br /> Was fail-safe verified to be operational? No No No <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced after testing? Yes <br /> Depth of water level from tank top (inches) 20 <br /> Wait time for water level to stabilize (hr:min) 0:05 <br /> Test start time 9:33 AM <br /> Initial Probe Reading 4.8383 <br /> Test end time 9:48 AM <br /> Final Probe Reading 4.8381 <br /> Test duration (hr:min) 0:15 <br /> Change in water level (±0.0000 inches) -0.0002 <br /> Pass/Fail threshold (±0.0020 inches/}Hr.) 0.0020 <br /> TEST RESULT PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.