Laserfiche WebLink
0 6 <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> SPONSE PLAN—PAGE 1 (One form per facility) <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rot. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) — — <br /> BUSINESS NAME(Same as FACILITY NAME) R02. <br /> QUIK STOP MARKET#152 <br /> BUSINESS SITE ADDRESS R03. I CITY Roo. <br /> 1721-1 SOUTH CHEROKEE LANE LODI,CA 95240 <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> • If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> • Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> • Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> • Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> • We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the produalwaste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Comp] only if a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. Rao. <br /> R11. R21. R31. <br /> R12. R21 R32. <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. R25. R35, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE R50. <br /> Mike Karvelot Director of Environmental Affairs <br /> NAME R41. TITLE RSr. <br /> Debbie Markovich Director of Petroleum <br /> NAME R42. TITLE R52• <br /> Chris Writ Director of Construction&Maintenance <br /> NAME R43_ TITLE R53. <br /> Sami Alkoussa District Advisor <br /> V. MONITORING INDICATORS <br /> MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TQ VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: Rho. <br /> Additional system testing or data collection 804spection by qualified persons ffirRecalibration of equipment <br /> Other: <br /> Follow the steps as outlined in the accompanying "Simplified Response Plan for the Removal of an Unauthorized <br /> Release From the Interstitial Space of Double-Containment UST Systems". <br /> UST Response Plan(3/2008)-1/3 <br />