My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:20:47 PM
Creation date
6/23/2020 6:55:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [x] NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Upgrade dispenser to Dresser Wayne Ovation R+1 hlender dispensers <br /> Install Bravo Adaptor frames . Upgrade existing TLS 350 with DIM module, <br /> requiring cold start . Convert existing 91 (8K) tank to diesel , <br /> convert existing R9 (10K) tank to 91 =rodu rt _ Cnnd77rt final tPGt i ng <br /> with reports to owner and agency. <br /> Cold-start of monitoring system performed on Friday morning, <br /> 10-12-12 . <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Rravn Ada=tnr P]_ates, VPPdP.r-Rona DTM Mndiil P, TlrPssPr Wayne 3+1 <br /> blender disnPnsers. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.