My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:58:11 AM
Creation date
6/23/2020 6:55:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery <br />Fill Riser <br />OPW <br />Ball Float <br />Tube Cut <br />per Loca I <br />Requireme <br />6' <br />14" Minimum <br />Clearance for <br />Float <br />� Align Float Along Length of Tank --� Sy <br />Figure 24 Pr <br />Ac <br />Orient socket <br />Figure 24A <br />laptor be - <br />re m jack <br />rew bolts <br />FOR TESTABLE MODELS ONLY: Check installation <br />again as done in Step 23 to ensure poppet actuates and <br />resets properly. See page 17 for full testing details. Ap- <br />ply pipe dope to the socket adaptor threads. Pipe dope <br />should be a non -hardening gasoline resistant pipe <br />thread seal compound. Install socket adaptor and <br />torque to 3.5 ft -lbs (42 in -lbs) minimum to 5.0 ft -lbs (60 <br />in -lbs) maximum. After installing socket adaptor where <br />required, pressure test testable overfill valve per CARB <br />201 01 D to ensure valve is vapor tight. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.