Laserfiche WebLink
i <br /> California Environmental Reporting System(CERS) Underground Storage Tank-Tank Information <br /> Facility/Site <br /> 0 <br /> GRUPE COMMERCIAL COMPANY HANGER##2 1ID <br /> 101$1293 <br /> 000 S LINDBERGH ST <br /> TOCKTON,CA 95206 <br /> Submittal Status <br /> Submitted on 1/18/2017 by mourice liu of GRUPE COMMERCIAL COMPANY HANGER#2(STOCKTON,CA) <br /> Type of Action <br /> Type of Action(UST Tank) <br /> Confirmed/Updated Information <br /> Facility Information <br /> GRUPE COMMERCIAL COMPANY HANGER#2 <br /> 000 S LINDBERGH ST <br /> TOCKTON,CA 95206 <br /> Tank Description <br /> Tank to# Date UST System Installed Tank Configuration <br /> A0241701 1/1/1989 A Stand-alone Tank <br /> Tank Manufacturer Date Existing UST Discovered Number of Compartments in the Unit <br /> WENS CORNING 1 <br /> Tank Capacity In Gallons Date UST Permanently Closed Additional Description <br /> 12000 <br /> Tank Use and Contents Tank Construction <br /> Tank Use Tank Contents Type of Tank <br /> Aviation Fueling Jet Fuel Double Wall <br /> Other Petroleum Contents PrimaryContainment Secondary Containment <br /> Fiberglass I Fiberglass <br /> Other Non-Petroleum Contents <br /> i <br /> verfili Protection <br /> Audible/Visual Alarms Yes Fill Tube Shut-Off Valve <br /> Ball Float Exempt <br /> Product/Waste Piping Construction <br /> Piping Construction Primary Containment Secondary Containment4f Piping/Turbine Containment Sump <br /> Double-walled Fiberglass ! Fiberglass None <br /> Piping System Type { I <br /> Pressure ! <br /> Vent,Vapor Recovery(VR)and Riser/Fill Pipe Piping Construction <br /> Primary Containment Vapor Recovery Primary Containment Riser Pipe Primary Containment ''Vent Piping Transition Sumps <br /> None <br /> Fiberglass i None Steel i <br /> Fill Components Installed <br /> Secondary Containment Vapor Recovery Secondary Containment Riser Pipe Secondary Containment I Yes Spill Bucket <br /> iYes Striker Plate/Bottom Protector <br /> Containment Sum <br /> Under Dispenser Containment(UDC) Corrosion Protection <br /> Construction Type Construction Material Sacrificial Anode <br /> No Dispensers Impressed Current <br /> Yes Isolation <br /> Applicant Certification <br /> Applicant Name Applicant Title Date Certified <br /> Maurice Liu Vice President <br /> R E C <br /> FS Krw <br /> E- <br /> jAci' 1 20417 <br /> Printed on 1/18/20171:51 PM <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />