My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
5000
>
2300 - Underground Storage Tank Program
>
PR0232417
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 9:31:32 AM
Creation date
6/23/2020 6:55:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232417
PE
2361
FACILITY_ID
FA0003676
FACILITY_NAME
GRUPE COMMERCIAL COMPANY HANGER #2
STREET_NUMBER
5000
Direction
S
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S LINDBERGH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232417_5000 S LINDBERGH_2017-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility/Site <br /> RUPE COMMERCIAL COMPANY HANGER#2 CERS ID <br /> 000 S LINDBERGH ST 10181293 <br /> OCKTON,CA 95206 UST Tank g <br /> TA0241701 <br /> Pipe Monitoring is Performed Using the Following Methods) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry Leak-A-Alert Leak-A-Alert <br /> Panel Model R Leak Sensor Model# <br /> LA-02 LS-01 <br /> es Leak Alarm Triggers Automatic Pump Shutdown <br /> es Failure/Disconnect Triggers Pump Shutdown <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer . MLLD Model <br /> Redlacket FXID <br /> Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed in-Une Testing ELLD Triggers Automatic Pump Shutdown <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> Pipeline integrity Testing Visual Pipeline Monitoring <br /> Pipeline integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> No Dispensers <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer <br /> Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# <br /> UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer <br /> UDC Construction <br /> DC Leak Sensor Model <br /> UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> Yes Secondary Containment Testing <br /> Yes Spill BucketTestin <br /> REC"' , <br /> Printed on 1/18/20171:51 PM ENVIRONMENTAL HEALTH <br /> ) ART INA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.