Laserfiche WebLink
UNDERGROUND STORAGE TANK ; <br /> r' RESPONSE PLAN.-..PAGE 1 (Ono fonnper facility) <br /> r <br /> TYPE OF ACTION I.NEW PLAN []2.CIIANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY ID 8(Agency Use Only) — <br /> BUSINESS NAME(Same as FACILITY NAME) Ret. <br /> BUSTNESSSITE gDDRGSS CIT <br /> 07 <br /> II, SPILL CONTROt AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response pians and procodures in the facility's Hazardous Materials <br /> Business Plan. <br /> P it sofa Io do so,facility personnel will take immediate measures to control or stop any release(e.g.,dctivate pump shut-off,etc.)end,if necessary,safely remove <br /> remaining hazardous material&am the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability or the secondary containment system to <br /> contain the hazardous material,but not greater than 30 colon dar days,or sooner#f required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Y Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become loo saturated to be <br /> effective or which Is no longer Intended#br use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 rinds that <br /> It is non-hazardous. Used absorbent material,reusable or waste,will be stored In a properly labeled and scatled coniaingr.Waste material shall be disposed <br /> "appropriately. <br /> Y Facility personnel will detennina whether any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material.If lite water is contaminated,it will be managed as hazardous waste unless a waste determination in accordeneo with 22 CCR§66262.1 1 finds <br /> that it is non-hazardous. if rime water has a petroleum sheen(#.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(haza(loma or norrhazardous)from sumps,spill containers,eta will not be disposed to storm water systems. <br /> Wo will review secondary containment systems rot possible deterioration irony orthe following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary comalmmem; <br /> 3. Hazardous material,other than the producUwasta stored in the primary containment system,Is placed inside secondary containment to treat or neutralize <br /> released produWwasto,and the added material or resulting material from such a combination is not compatible with secondarycootaimncmt. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at lost monthly,and oiler each uso,supplies are replenished as needed. Detective equipment is repaired or replaced as necessary. <br /> E UIPI IENT NOT PER11ANENTLY ON-SfTMR BUT AVAiLABI,E FOR USE IF NEEDED: (Complete only iia licable <br /> EQUIPAIENT LOCATION AVAILABILITY <br /> � r✓! rj a ata 019 ( R2o. Z 7 <br /> am t. R21. R31. <br /> R12, R22. R32. <br /> all R23. R33. <br /> Rid. VA. RX <br /> RK R25. Ras. <br /> IV. RI!ESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IWARE RESPONSIBLE FOR A UTHORiZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rae, TiTLE m 830. <br /> NAME It4l. TITLE R31. <br /> i'IAAfE Rat. TITLE Raz• <br /> HANE Rai. TITLE Rs. <br /> V, MONITORING INDICATORS <br /> IF MONiTORiNO INDICATES A POSSIBLE;UNrWTi#ORIZED RELEASE,STEPS TO VERIFY THE RELEASE;WILL BE MADE AS FOLLOWS: <br /> O Additional system testing ordain collection Vinspection by qualified persons O Recolibradon of equipmem <br /> Other: <br /> R(A <br /> a <br /> a Isom <br /> UST Response Pian(3/2008).1/3 <br /> EE L <br /> F)EPARTMENT <br />