My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
5000
>
2300 - Underground Storage Tank Program
>
PR0232417
>
COMPLIANCE INFO_1989-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 2:20:20 PM
Creation date
6/23/2020 6:55:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2016
RECORD_ID
PR0232417
PE
2361
FACILITY_ID
FA0003676
FACILITY_NAME
GRUPE COMMERCIAL COMPANY HANGER #2
STREET_NUMBER
5000
Direction
S
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S LINDBERGH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232417_5000 S LINDBERGH_1989-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of TestinglServicing <br /> DEC 29 20i <br /> Software Version Installed. N/A <br /> Com tete the following checklist: ( t <br /> ® Yes ❑ No' Is the audible alarm operational? -- <br /> ® Yes ❑ No' Is Me visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ NIA fails to operate, or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sumprrrench <br /> Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm Positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill points)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement pans in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes [I No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No- Is all monitoring equipment operational per manufacturers specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: -- <br /> Monitoring System Certification Page 2 of 4 221 07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.