Laserfiche WebLink
UNDERGROUND STORAGE,rANK <br />RESPONSE PLAN - PAGE I (One fora per facility) <br />TYPE OF ACTION 0 1. NEW PLAN [12, CHANGE OF INFOMIKHON ROL <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Ont)) <br />BUSINESS NAME (Same as FACILITY NAME) R02 - <br />BUSINESS SITE ADDRESS IR03I <br />I V0 0 e 5+/?-ef <br />CITV R04. <br />11. SPILL CONTROt AND CLEANUP METHODS <br />—'This- <br />plan addresses unauthorized releases from UST systems and s—up-plenictus the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. <br />If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut -orf, etc.) and, ifnLcessary, safety renlove <br />remaining hazardous material from the UST system. <br />Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste, <br />5- Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste detennination in accordance with 22 CCR §66262.11 rinds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and scaled container. Waste material shall be disposed <br />appropriately. <br />Facility personnel will determine whether any water remove(] from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managtd as hazardous waste unless a waste detennination in accordance with 22 CCR §66262.11 rinds <br />that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not necessarily display <br />rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to stonn water systems. <br />We will review secondary containment systems for possible deterioration ifany of the following conditions occur: <br />1. 1 lizardous material in contact with secondary containment is not compatible with dw, material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or clean tip hazardous material collected in secondary containment; <br />3. hazardous material, other than the produculwaste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination isnot compatible with secondary containment. <br />111. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE. Spill control and clean-up equipment kept pennariently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUI ll.,NIEN-r NOT PERNIANENTLYONSITE, BUT AVAILABLE FOR USF IF NEEDED: (Complete nly irapplivable) <br />EQUINNIEN'r <br />LOCATION <br />AVAILABILITY <br />RIO <br />C)0�r_ to R20. <br />q Hau /5 R30 <br />111; <br />1 921 <br />K31. <br />R12 <br />R22 <br />"i3 _2 <br />R13 <br />R23 <br />K33. <br />R14. <br />R24. <br />R34 <br />1125. <br />R35 <br />IV, RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARF: RFS POi 4SI IlLE FOR AUTHORIZING ANN' WORK NECESSARY UNDER Til IS RESPONSE PLAN: <br />- <br />NAMF <br />— --------------- - - ---------- ----- - <br />'['IT 1, E <br />0 <br />N A N I E R41 <br />TITLE Rs1. <br />NAME R42- <br />TITLE R52 - <br />NAME P.43. <br />1 <br />TITLE PUS 3 <br />— <br />V. MONITORING INDICATORS <br />IF NIONrrOR1NG INDICATES A POSSIBLE U1,19THORIZED RELEASE, STEPS TO VERIFY -1-111: KELEASE WILL BE MADE AS FOLLOWS: <br />U Additional system testing or data collection CWinspection byqualified persons 0Recalibration ofequipulent <br />Other: <br />H60 <br />UST Response Plan, (3/2008) - 113 <br />