Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD • <br />490-544 <br />490-54b <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING [:12. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />El 4. NO DISPENSERS 099. OTHER (Specify): Bulk Delivery <br />4 <br />PANEL MANUFACTURER: 90-" 1 MODEL # <br />490-56. <br />LEAK SENSOR MANUFACTURER: 490-11 1 MODEL #(S): <br />490-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO <br />490-19 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 0 a. YES El b. NO <br />490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a. YES 0 b. NO <br />490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. El a. YES 0 b. NO <br />490-62 <br />2. UDC CONSTRUCTION IS rl 1. SINGLE -WALLED [12. DOUBLE -WALLED <br />490-63 <br />IF DOUBLE WALLED: <br />- <br />490baa <br />UDC INTERSTITIAL SPACE IS MONITORED BY: [11. LIQUID [] 2. PRESSURE [] 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS El a. YES El b. NO <br />490-64b <br />VII. PERIODIC SYSTEM TESTING <br />El 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED. (23 CCR §2644.1) <br />2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS- <br />490-66 <br />3, SPILL BUCKETS ARE TESTED ANNUALLY. <br />49"7 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />Alarm logs 490-68a 0 Visual Inspection Records 490-68b ❑ Tank integrity testing results 490-68c <br />❑ SIR testing results (and supporting documentation records). 490-68d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-68f ❑ Corrosion Protection 60 -day logs 490-68g <br />El Equipment maintenance and calibration records. 490-68h <br />I. TRAINING <br />Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 49o -69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />SVvRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g <br />E] OTHER (Specify): M69h, M69i <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />> Operation of the UST systems in a manner consistent with the facility's best management practices <br />> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />> Names of contact person(s) for emergencies and monitoring alarms. 49o-70 <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />OVERFILL PROTECTION; DROP TUBE, WITH MECHANICAL FLAPPER THAT SHUTS FLOW DOWN AT 95% FILLED. <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of LIST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME JERRY D.HARTER 490-72 TITLE AVIATION MANAGER <br />490-73 <br />NAME 490-74 TITLE <br />490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owncr/operatbr of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR. SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 <br />DATE: <br />490-77 <br />". <br />REPRESENTING: 0 I_TMk"d 77 ffit� Qgntogerator 0 3. Authonzed Ren�entatiy�eD[Q_w_na <br />_Q m <br />APPLICANT NAME (print)/ 490-78 <br />APPLICANT TITLE: <br />490-79 <br />JERRY D. HARTER I <br />AVIATION MANAGER <br />UPCF UST -D (12/2007) 3/4 <br />