Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br />490-54b <br />El 1. CONTINUOUS ELECTRONIC MOMTORING El 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONF, <br />El L NO DISPENSERSE399- OTHER (Specify). <br />----------------- .... . .............. ....... ..................... .-------------*--------------- <br />---------- M-56PANELNIANUFACTURER �IOD19' <br />-----------*------------------------------ - <br />_— <br />------------*........................ <br />LEAK SENSOR MANUFACTURER: 4W-57 <br />1 6 . 4M-59 <br />#(S): <br />DETECTION OF A LEAK INTO -1 HE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 0 a YES El b, NO 4"n se <br />UDC LEAK ALARM TRIGGERS AUTOMATIC Pumi, SHUTDOWN L] a YES 0 b. NO <br />FAILURE/ DISCONNECTION OF UDC MONITORING SYSTEM -TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a. YES El b, No <br />UDC MONITORING S-TOPS TI Ir FLOW OF PRODUCT AT THE DISPENSER. 0 a, YES El b. NO M-62 <br />2. UDC CONSTRUCTION IS Ell-SINGLEAVALLED [11DOUBLE-WALLED M-63 <br />IFDOUBLE WALLED: --•4990=i- 4 <br />UDC INTERS-111(AL SPACE IS MONITORED BY, ES SURE 0 3. VACUUM <br />!� ------- - __ <br />------ ------ .... ------- ------------ .. . ...... 1-1 ... ­­ ............. <br />A LEAK WITHIN THE SECONDARY CONTAINNIENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Ela YES El b- NO 49464b <br />VII, PERIODIC SYS'T'EM TESTING <br />El I ELD TESTING._ THIS FACILITY HAS BEEN NOTIFIED—BY—NE S'T'ATE WATER RES&IJRCES CON'T'ROL —BOARD THAT F_NHANCED 490-65 <br />LEAK DETECTION (ELD) MUST BE PERFORMED. PERIODIC rLD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. (23 CCR §2644. 1) <br />- OW - I ........................ --------------- -------- ---------- ­­­ ------------------- .... .... ­_­ ------- ------- <br />2'2, SECONDAl1YCON'rAlN,%IFXT COMPONENTS ARE TESTED EVERY 36 MONTHS 4%66 <br />­­._____­ ---------------------------- ---------- ----------------- --------- ------------- -------- ---- ---------- — --- I------- <br />-�3- -S-P-11 C_ K X ik E­ TESTED A N N UA 1, 1, 1'. 490.67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />[`Alarm logs 4th)-ma ER Visual Inspection Records 4-m-6sb ElTank integrity testing results 4wo-(-4c <br />[I SIR testing results (,and supporting documentation records). 4'X46Sd El Tank gauging results (and supporting documentation records), 4-x)-on, <br />El ATG Testing results (and supporting documentation records). 4VJ*Sf E] Corrosion Protection 60-clay logs mi-rsg <br />El Equipment maintenance and calibration records. 4'X468h <br />IX. TRAINING <br />&-versonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties, 4,A4 <br />REFERENCE DOCUMENTS MAINTAINED AT FACHA I'Y (Check all that apply) <br />Eq'I His UNDERGROUND STORAGE-. TANK MONITORING PLAN (Required) s941-01h <br />®-OPERATING MANUALS FOR l:;.FCTRONIC MONITORING EQUIPMENT (Required) 4,n <br />0 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS vm-t�qd <br />WCALIFORNIA UNDERGROUND STORAGE TANK LAW <br />flJ`STATL WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 4M-0)f <br />EJ'SWRCB PUBLICATION: "UNDERSTANDING AUTONIATICTANK GAUGING SYSTEMS" 4-x1.(og <br />Ej OTHER (Specify): nt69h- timet. <br />(n� 1 his facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council ([CC), <br />The "Designated UST Operator' will train facility employees in the proper operation and maintenance of the UST systems annually and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />3" Operation of the UST systems in a manner consistent with the facility's best management practices <br />> The facility employee's role with regard to the monitoring eqtiipiiientasspecificd in this UST Monitoring Plan <br />> The facility employee's role with regard to spills and over fillsas specified in the UST Response Plan <br />Names of contact person(s) for emergencies and monitoring alarms. 490-7.) <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan- 4w-71 <br />X1. PERSONNEL RESPONSIBILITIES <br />The USTOwner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) a0 conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The follm M* persons)are resp si r performing the monitoring and equipment mai"017ci, <br />r <br />I t 111 k (___ P/16/dy/ut_ <br />I 49o-72 TITLE 4W-71 <br />NAME 4%L74 TITLE, 4,X),15 <br />The Designated Operator shall perforin a monthly visual inspection of the facility, provide a report to the owner/operator, and inforin the omierloperatur of any <br />conditions that need follow-up action. <br />----------- --- <br />X11. ONVNER/OPFRATOR SIGNATURE <br />CERTIFICATION: I certify that I t lie i n forni ill ion provided herein is true and accurate to the best o I* it i), knovk ledge. <br />A I'll L ICA N I'Sl G 4N,trU R I. <br />/146PUC <br />DATE 4"),).17 <br />'Zo I <br />[32 r­h.PL_­ r <br />­0g,ul, _ E3 <br />APPLICANT NAME (print) au 490-7X <br />APPLICANTTITLE: <br />u PcF us -r -r) (I M007) 314 <br />