Laserfiche WebLink
Dp9onOCri.ng System Certification <br />..Site Address: op k c� r � ���^ �4 � f f Date of Testing/Servicing: <br />F. In -Tank Gauging /SIR Equipment:2f Check this box if tank gauging is used only for inventory control. <br />y ❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -lank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />— - -- <br />— .. <br />I ---- --.- •—j—" — NivNci C;Mly U11U Mrunnuuvn, mcivaing testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />' ❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />" In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipm <br />❑ N/A I (Check all that apply) Simulated leak rate: <br />Tbrtification'was a leak simulated to verify LLD performance? <br />3 g.p.h.; E30.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? :. <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Y!es <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />W N/A <br />malfunctions or fails a test? <br />❑ Yes <br />L4 <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />rA <br />N/A <br />Qr Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section <br />H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />