My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_1999-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:05:39 PM
Creation date
6/23/2020 6:55:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2008
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_1999-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Waterloo Liquor 2512 Waterloo Rd. Stockton CA 95207 (SR0055348) <br />list). The component must bear the appropriate mark as required by the <br />independent testing organization. <br />5. Any changes in information and scope of work must be submitted to EHD for <br />approval prior to commencing work. All new addenda supersede the previous <br />ones. <br />6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br />required): <br />a. One hour hydrostatic test (or equivalent) on the 91 spill bucket. <br />b. The test fluid should cover the top joint, and be no less than 1.5 inches <br />below the top of the spill bucket, regardless of the spill bucket's capacity <br />for the 91 spill bucket. <br />c. Test operation of the drain valve of the 91 spill bucket. <br />d. 87 leak detector functionality test (3 gallon per hour at 10 psi leak test). <br />7. If concrete is broken near the UST, a third party tank integrity test and/or line <br />integrity test (or equivalent) must be performed, once concrete is poured in <br />accordance with the manufacturer's guidelines. Results must be received by the <br />EHD within seven days of returning the facility to operating condition. <br />8. A "Certificate of Compliance for Underground Storage Tank Installation Form C" <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] <br />before this repair will be considered complete by the EHD. <br />If you have any further questions, please contact me at (209) 468-3453, fax to (209) 468- <br />3433 or email to acacapit@sjcehd.com. <br />Aris Cacapit <br />Environmental Health Specialist <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.