Laserfiche WebLink
Phil-Tite Installation, Operation and ntenance Manual, Page 21 isExecutive Order VRA 01-H <br />Figure -7 <br />85400 Drain Valve <br />85400 DRAIN SHUT OFF VALVE ASSEMBLY <br />REMOVAL, INSTALLATION and ADJUSTMENT INSTRUCTIONS <br />REMOVAL <br />FIRST, REMOVE THE STAINLESS STEEL RETAINER RING (85031) (BY SQUEEZING THE ENDS TOGETHER AND <br />PULLING UP) THAT HOLDS DOWN THE FOAM FILTER AND SCREEN ASSEMBLY. LOOSEN AND REMOVE THE <br />HEX SCREW (USING A 1/4 DRIVE RACHET AND 3/16 HEX SOCKET) IN THE UPPER CLAMP. USING A <br />THIN BLADE SCREWDRIVER, OPEN OR INCREASE THE GAP IN THE UPPER CLAMP. MOVE THE DRAIN <br />VALVE HANDLE TO THE MIDDLE OF THE SPILL CONTAINER. PULL/LIFT UP ON THE HANDLE TO REMOVE <br />THE DRAIN VALVE ASSEMBLY. A WOODEN HANDLE MAYBE USED TO FACILIATE REMOVING THE DRAIN <br />VALVE ASSEMBLY. <br />INSPECTION <br />INSPECT THE DRAIN VLAVE AND SPILL CONTAINER FOR <br />ANY DIRT, SAND, DEBRIS, AND FOR ANY DAMAGE PARTS. <br />REMOVE/CLEAN ALL DRIT, GRAVEL, DEBRIS, FROM THE / UPPER CIAMP HEX SCREW <br />BOTTOM OF THE SPILL CONTAINER AND REPLACE ANY / LUBRICATE WITH ANTI-SIEZE <br />DAMAGED 'O'RINGS AND PARTS. REMOVE ANY BURRS ON <br />THE BLACK STEEL RISER MADE BY THE REMOVAL ADAPTER. <br />INSTALLATION <br />INSTALL THE DRAIN VALVE ASSEMBLY OVER THE SPILL <br />CONTAINER RISER. MAKE SURE THE TWO CLAMPS ARE IN <br />ALIGNMENT AND THE CONNECTION LINKS ARE STRAIGHT <br />AND EVEN. CHECK TO INSURE THE UPPER CLAMP OPENING <br />IS NOT OVER ANY RISER INDENTATIONS. WITH THE <br />HANDLE POSITIONED OVER THE CENTER OF THE RISER, TAP <br />THE TOP OF THE HANDLE WITH A SOFT RUBBER MALLET <br />OR HEEL OF YOUR HAND TO SEAT THE SHUT OFF VALVE <br />OVER THE BOTTOM 'O' RING. <br />LUBRICATE THE HEX SCREW WITH "ANTI-SIEZE" COMPOUND <br />AND INSTALL IT INTO THE UPPER CLAMP. WITH THE <br />HANDLE POSITIONED OVER THE CENTER OF THE RISER <br />TIGHTEN THE HEX SCREW 80-100 INCH LBS. <br />ADJUSTMENT <br />UPPER CLAMP (85040) <br />REfNNER RING (85031) <br />CHECK THE DRAIN VALVE ASSEMBLY FOR PROPER OPERATION. MOVE THE HANDLE TO THE CLOSED POSITION, (TOWARD <br />THE SPILL CONTAINER SIDEWALL) THE HANDLE SHOULD SNAP CLOSED. IF THE HANDLE IS HARD TO CLOSE OR TO LOOSE <br />(NO SNAP) THEN RE -ADJUST THE HANDLE TO ACHIEVE THE PROPER RESISTANCE. MOVING THE HANDLE TO THE MIDDLE <br />OF THE RISER, AND LOOSENING THE HEX SCREW. RE -POSITION THE HANDLE, FOR TIGHTER (MORE SNAP) MOVE THE <br />HANDLE MORE OPEN, FOR LOOSER (LESS SNAP) MOVE THE HANDLE MORE CLOSED, THEN TIGHTEN THE HEX SCREW <br />(80-100 INCH LBS.). RE -CHECK THE DRAIN VALVE ASSEMBLY FOR PROPER OPERATION. <br />REINSTALL THE STAINLESS STEEL RETAINER RING AND CLOSE THE VALVE. <br />