Laserfiche WebLink
Phil-Tite Installation, Operaticod Maintenance Manual, Page x Executive Order VR -1 0 1 -H <br />Phil-Tite Phase I • Recovery System Exhibit I Equipment Checklist <br />On line below, write out what configuration you used. Follow the legend below for each series spill <br />container (e.g. • • write • 86100-F-15 if • had a 85000 series, 15 gallon foplacernentproduct <br />• • <br />Mfiguration used: <br />Equipment ManufacturedModel Number <br />Spill • ■' 85000 series <br />■ 85000-1 series <br />W represented • <br />ill container <br />YYY represented • <br />■ 15 = 15 -gallon capacity <br />■ -. • r • • . • • - - . <br />ZZZ represented by: <br />❑ 15 = 15 -gallon capacity <br />❑ EXT = external for sump configuration (not available for <br />85000-1 series) <br />❑ NV = Vapor (replacement spill container) <br />❑ F = Product (replacement spill container) <br />❑ S = Stainless Steel (SS) Sleeve <br />❑ GS = Stainless Steel (SS) Sleeve and <br />Gravel Shield <br />Spill Container Lid <br />❑Phil-Tite 85011 (not required with sump configuration lid) <br />Debris Container <br />❑Phil-Tite PP -1005 TB (product) (required) <br />❑Phil-Tite PP -1005 TBP (vapor) (not required) <br />Product Adaptor <br />❑Phil-Tite SWF-100-B <br />Vapor Adaptor <br />❑Phil-Tite SVW-101-B <br />Riser Adaptor <br />❑Phil-Tite M/F 4X4 <br />Riser Support Bracket <br />❑Phil-Tite M-1600 <br />(Continued on next page.) <br />