Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ^ EMARONMENTAL HEALTH DEPARTMENT <br /> 600 East Main SW".Stboktdn,CA 95202-3029 <br /> Telephone:(209)468-340 Fax:(209)4683433 Web:www.sjgov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> F nspet9l0n <br /> Waterloo Liquor Wednesday, October 13, 2010 <br /> 2512 E. Waterloo SR0057217 <br /> Onsite Setae Te6niCWONNww. 1co swim flilenuiGurer ; <br /> Jesse Vera 15259508UT 5/5/2012 Franklin 357353761 11/25/10 <br /> SERVICE SERVICE <br /> '""`"` eak detectW Spill bucket 0 minimum S gallon <br /> D mechanical Model: <br /> Q electronic Serial IOE' (.) L�'hour hydrostatic D Incmt T&6TS <br /> 0 line test o rammed ©Calohroell S'getEm ©Ocher <br /> Look detector Spill bucket Q minimum 5 gallon <br /> voa <br /> Q M' honical Model: Q ff Tlhotr hydrostaRic Q Inman T&STS <br /> O owwonic Serial a 13 Caldwell Sys tern ©Other <br /> [3 line test eropwmed <br /> —Leak detector Spill bucket D minimum 5 gallon <br /> 13 mechanical Model: 0 ffThour hydrostow CI incon Ts-sT6 <br /> 13 elet conic Serial#: q Caldwell System CI Other <br /> Q lk+e tleast mad <br /> sensor Prim I at <br /> CI positive Shutdown Model: "vY p�testingQ Ofail safe Serial#: <br /> 13 NA � �psi <br /> minutes <br /> senator Secondary oontainmient testing for: <br /> c3 0 positive shutdown Model: UDC(s) 91 .. Piping <br /> O tail safe Serial#; �Sump(s) . UST(s) <br /> ©NA <br /> yew 8 Testing for the above components are next due by: <br /> 13 Weshutdown Model: <br /> 131011 safe Serial X. Nor ftwe ae ew=e mn 2-mMrwmt mnpo orw wo rewired to a vial upon <br /> O NA MsMNetlon,o maMl+e Nap,and wary 3s ewnva u,ers.nsr <br /> C1 Drop tube with mechanical overfill at 95% 0 Cold start of monitoring panel <br /> –......Drop tube with mechanical overfill at 95% 10 Corrosion protection <br /> 0 overm prevention(see LG latter 150M1) 13 Other:a"below <br /> Observed secondary containment testing of the 87-octane fuel piping at 5 psi maintained for one <br /> hour. Passed. I <br /> Previous inspection on October 11, 2010 verified secondary containment test of 91-octane and diesel <br /> fuel lines passed. Conditions of SR0057217 have been met. <br /> UST System not ready to return to operation until the conditions of separate permit SR0061062 have <br /> been met. <br /> THIS FACILITY IS SU&ECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHO Received By: Ti <br /> EM 23-" UST SERVICE REQUEST INSPECTION REPORT <br /> Rev osml10 <br />