My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SWRCB, January 2002 0 <br />Test Method Developed By: <br />1 Test Method used: <br />Page of 17 <br />6. PIPING SUMP TESTING <br />❑ Sump Manufacturer ❑ Industry Standard Professional Engineer <br />❑ Other (Spec) <br />❑ Pressure❑ Vacuum hydrostatic t, , <br />❑ Other (Specify) <br />Test Equipment Used: Cet W et '� e <br />Equipment Resolution: , p6 Z sr <br />amom <br />Sump # .L Sump # �. <br />Sump # Sump # <br />Sump Diameter: 2-1 2' <br />t r <br />Sump Depth: c f <br />D, <br />b it <br />,1 <br />Sump Material: Fo 4 5 <br />P+ b° <br />F® P -q lee S S <br />Height from Tank Top to Top of <br />Hi est Piping Penetration: <br />®� <br />Height from Tank Top to Lowest <br />`Aj <br />s <br />Electrical Penetration: 2- ?-1' <br />Condition of sump prior to testing: <br />Portion of Sump Tested' / . e` <br />PJr° !#+ ZT' <br />et16*-1,2 " <br />Does turbine shut down when <br />sump sensor detects liquid (both yes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />ees ❑ No ❑ NA <br />❑ Y ❑ N ❑ NA <br />roduct and water)?* <br />Turbine shutdown response time ,cl o G tlu d <br />�tJd� el"t A0 j__ <br />A. e) <br />Is system programmed for fail-safe <br />°es ❑ No ❑ NA <br />I es ❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ Yes❑ o ❑ NA <br />shutdown? <br />Was fail-safe verified to be s ' <br />pye1 <br />Yes NA <br />❑Yes o ❑ NA <br />❑Yes YNo ❑ NA <br />operational?* <br />Wait time between in" <br />pressure/vacueend starting <br />gter <br />test: /'0 ,,fr'pfcr <br />Test Start Time: 8: 3 Y— <br />%' / O <br />82 z o <br />Initial Reading (RO: ol�v 4-- 6w, le <br />vt $-k (s t <br />w�est e else <br />Test End Time: 2 ' d <br />qO <br />5"C� <br />Final Reading (RF): 1jr-A rA �, <br />vw3 4- Gwc-Ce— <br />a e' 6 <br />Test Duration: joInnim '-`'S <br />1-w to 4'IS <br />Change in Reading (RF-RO: "0 C4.+.—"r <br />iEl v G <br />ru U C <br />Pass/FailThreshold or Criteria: Itoo S 3tf rYr,'+ a . <br />, &O 3DB► <br />Test Result: VPass ❑ Fail <br />ass ❑Fail <br />Pass D Fail <br />❑ Pass ❑ 1hil <br />Was sensor removed for testing? es ❑ No ❑ NA <br />VYes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />❑ Yes ❑ No ❑ A <br />Was sensor properly replaced and es ❑ No ❑ NA <br />es 13 No ❑ NA <br />des ❑ No ❑ NA <br />❑ Yes ❑ No ❑ <br />verified fimctional after testing? <br />Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.