Laserfiche WebLink
SAN JOAQUIN COUNTY <br />y ^Krr 'i ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Waterloo Liquors <br />Monday, October 11, 2010 <br />Facility Address: <br />Service Request #: <br />2512 E. Waterloo Rd., Stockton <br />SR0061062 <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />Jesus Vera <br />5259508UT 5/5/2012 <br />DPM Split Repair (1/21/2012) <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑electronic Serial #: <br />❑ <br />❑ line test Mgrammed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑line tqqt programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑fail safe Serial #: <br />® <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />D 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />Ll� 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour,hydrostatic ❑ Incon TS -STS <br />Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) 87,91,diesel Piping <br />Sump(s) UST(s) <br />® <br />Testing for the above components are next due by: <br />04/11/2011 <br />Note: Please be aware that r containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />Confirmed corrosion protection at the underside of UDC #1/2. <br />Observed secondary containment testing of the diesel, 91 -octane fuel piping at 5 psi maintained for <br />one hour. Passed. Retest of the replaced components is required in six months of installation. <br />Confirmed visual fail of the secondary containment test of 87 -octane fuel piping. Observed soap <br />bubbles and hissing at the 87 -octane boot in the UDC #1/2. <br />Technician decided not conducting the 24-hour hydrostatic test (or equivalent) at UDC #1/2 due to <br />failure of 87 -octane secondary pass. UST System not ready to return to operation. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br />EHD2' -04 / v �� �/ UST SERVICE REQUEST INSPECTION REPORT <br />