My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:12:54 PM
Creation date
6/23/2020 6:55:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�7 <br />applicationsLIST SYSTEM RETROFIT OR REPAIR <br />as originals <br />(Submit minimum of plans & <br />1. site map enclosed? YES 1;'�" NO <br />2. Submit copies of ICC Service Technician and/or installer's certificate and all manufacturer training certificates each <br />person Installing or testing any component that Is repaired or replaced. Ensure a copy of the "Site He nd Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repai>orreplaced d attach a diagram drawn <br />to sole showing location of repairs and/or reps ents. If repairing a covibe how this will be done. (If <br />Addi piping, UDC's, or other UST equipment, or performing tank top upthe UST Installation Application <br />a 4-8 as necessary for a timely plan review): _ ^ <br />4. List of equipmenAo be used (A#8011 man fecturer's specifications s ehowing third -party approval): <br />
The URL can be used to link to this page
Your browser does not support the video tag.