Laserfiche WebLink
7 ry006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. he c n�p0d form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to 14j,,jK94WfWhW%qgeqcy. <br /> _ A V16 <br /> 1.FACILITY INFORMATION r <br /> Facility Name: WATERLOO LIQUORS Date of Testing: 4-12-2016 <br /> Facility Address: 2512 E WATERLOO RD STOCKTON CA <br /> Facility Contact: Phone: <br /> Date Local Agency Was Notified of Testing:3-31-16 <br /> Name of Local Agency Inspector(if present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2nd Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ® David A.Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ®ICC Service Tech. ®SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: h20 and tape measure Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DSL 4 <br /> Number,Stored Product, etc. <br /> ®Direct Bury ®Direct Bury ®Direct Bury ElDirect Bury <br /> Bucket Installation Type: ❑Contained in ❑Contained in <br /> ❑Contained in Sump ❑Contained in Sump Sump Sum <br /> Bucket Diameter: I 1 11 11 <br /> Bucket Depth: 13 13 13 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 1230 1230 1230 <br /> Initial Reading(Ri): 13 12 13 <br /> Test End Time(TF): 130 130 130 <br /> Final Reading(RF): 11 12 13 <br /> Test Duration(TF—Ti): 114R 1 HR IHR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> P.T BUCKETS. <br /> REPLACED 87 AND 91 DRAIN VALVES <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> T6Technician's Signature: Date: 4-12-2016 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br /> l <br />