Laserfiche WebLink
From: Franzen -Hill Inc. <br />SWRCH, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />Test FWIPMOnt Used: <br />To: 12094683433 Page: 5/8 Date: 8/12/2011 834:57 AM <br />6. PIPING <br />m <br />a Sump Manufacturer <br />0 Offiff gpec*) <br />0 Pressure <br />0 Other (Specif <br />Y) <br />M <br />Page _�_ of <br />TESTING <br />Q Industry Standard 0 Professional Engineer <br />0 Vacuum 0 Hydrostatic <br />vaufament Resolution: <br />= <br />Sump Material: --- <br />Height ftm Tank Top to Top of <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to tesbr. <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor Actects.fiquid (both 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA OEI <br />Yes oNo NA oYes ONo DNA <br />Mr t and water <br />Turbine shutdown response time <br />Is system programmed for fail -sato 0EYes DNo DNA oYes allo DNA Dyes OM DNA OYes DNo DNA <br />shutNo <br />Yes <br />D <br />Was <br />fail-safe <br />.1 <br />al sa 0 Yes 0 No C3 OYas ®No DNA ayes oNo DNA <br />._& o Yes 0 No 0 NA a Yes 0 No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />TestSUrt-Time: <br />Initial Reading <br />Test End Time: <br />., &I Reading W. <br />Test Duration: <br />Change in Reading (Rp-N: <br />Passir-ail Threshold or Criteria., <br />Was sensor immoved for toning? <br />Was sensor properly replaced an <br />13: M MM <br />moon <br />plyp2o"M0001 NO VC, <br />If the entire depth of the sump is not tested, specify how much wab'tested. If the answer to &a of the questions Indicated with an <br />asterisk ($) is "NUI or "NA", the entire sump must be tested {See SWRCALO-160) <br />This fax was sent with GFI FAXmaker fax server. For more information, visit: http://www.gfi.com <br />