My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY INVENTORY REPORTING <br />Facility Name: 7n^RW S� <br />~Y Facility Address: 81W <br />City: -� <br />County: 5 Ar,�a <br />State: [� <br />These were inventory variations that <br />exceeded the allowable limits for this <br />quarter. <br />C' <br />Tank # <br />Size <br />Product <br />3 <br />iz <br />std <br />Waste Oil <br />�ro <br />I hereby certify that all product level variations <br />for the above mentioned facility were,.' <br />within allowable limits for this quarter. . <br />OUT OF TOLERANCE „ A, <br />INVESTIGATIVE STEPS::Explanation <br />Send to (Local Agency): <br />Step 1 Review Records, <br />Step 2 New reconciliation <br />performed. <br />Step 3 Shell Oil notified. <br />Step 4 Records review from <br />the last stable <br />situation. <br />Step 5 Physical facilities <br />inspected for leaks. <br />Step 6 Dispenser meters <br />calibrated. <br />Step 7 Piping hydrostatically <br />tested. <br />Step 8 Underground. storage <br />tanks precision tested. . <br />Step 9 Additional Investi�pation <br />as required by ll <br />or the loca ager*- <br />This quarterly summary report <br />shall be submitted within 15 days <br />after the end of each quarter. Check <br />the quarter you are submitting <br />❑ Quarter 1 January thru March <br />Submit by April 15 <br />❑ Ouarter 2 — Apri I thru June <br />Submit by July 15 <br />PgQbuarter 3 — July thru September <br />Submit by October 15 <br />❑ ouarter 4 —October thru December <br />Submit by January 15 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.