My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:43:39 PM
Creation date
6/23/2020 6:55:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
481
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ <br /> 09/30/2004 09:42 FAX 510 614 8396 PARADISO MECHANICAL Q 003 <br /> PETROLEUMGENERAL& <br /> and L SERVICES , <br /> P.O. 1 <br /> LICENSE NO.67790 <br /> E(510)61 <br /> 1MLUAt�S STREET FAX(510)61 <br /> SAN LEANDRO.CA <br /> September 30, 2004 <br /> Greg A. Gurss <br /> Gettler-Ryan,Inc. <br /> 3140 Gold Camp Dr.,Ste. 170 <br /> Rancho Cordova, CA 95670 <br /> Shell,2375 W. Grant Line Rd.,Tracy—Response to Plan Check Comments <br /> All remaining fuel will be removed from associated lines with our air powered explosion <br /> proof vacuum. The remaining fuel will be returned to the U.S.T. Piping will be <br /> disconnected from U.S.T. We will inert the pipes with nitrogen prior to cutting and <br /> splicing the existing Double Wall F.R.P.product and vapor piping. <br /> During our pre-construction inspection,we determined existing piping is Ameron. Please <br /> see our attached training certifications. <br /> If anything further is needed,please call or e-mail. Thank you. <br /> Sincerely, <br /> ��f V <br /> Eric V.Montesano <br /> Vice President <br /> EVM:erm <br />
The URL can be used to link to this page
Your browser does not support the video tag.