Laserfiche WebLink
TTIFIED PROGRAM CONSOLIDATED FORTT <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - INSTALLATION <br /> CERTIFICATE OF COMPLIANCE <br /> (One page per tank) <br /> Page 10 of 10 <br /> I.FACILI'T'Y IDENTIFICATION <br /> BUSINESS NAME IS.as FACILITY NAME or DBA—Doing Business As) 3. <br /> Grant Line Shell <br /> ADDRESS(For local use only) 476. <br /> 2375 W.Grant Line Road,Tracy,CA 95376 <br /> FACILITY ID# 1• TANK ID# 477• <br /> 136187-Premium <br /> H.INSTALLATION <br /> (Check all that apply) <br /> 478. <br /> ® The installer has been trained and certified by the tank and piping manufacturers. <br /> ❑ The installation has been inspected and certified by a registered professional engineer having education and experience 479. <br /> with underground storage tank installations. <br /> 480. <br /> ❑ The installation has been inspected and approved by the Unified Program Agency. <br /> 481. <br /> ❑ All work listed on the manufacturer's installation checklist has been completed. <br /> 482. <br /> ® The installer has been certified or licensed by the Contractors' State License Board. <br /> ❑ The underground storage tank, any primary piping, and secondary containment was installed according to applicable 483. <br /> voluntary consensus standards and written manufacturer's installation procedures. <br /> Description of work being certified: <br /> III.TANK OWNER/AGENT SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF TANK OWNER/AGENT DATE 484. <br /> NAME OF TANK OWNER/AGENT(print) 485• TITLE OF TANK OWNER/AGENT 486. <br /> UPCF(1/99)Hwfwrc-c-1/2 http://www.unidocs.org Rev.02/16/00 <br />